1 / 16

Presentation to Jefferson Township Public Schools for Feasibility Study

Presentation to Jefferson Township Public Schools for Feasibility Study. Agenda. Background Findings Recommendation Options Timelines. Background. Over 3,600 Students 8 Facilities Jefferson Twp HS Jefferson Twp MS White Rock ES Stanlick ES Milton Pre-K Cozy Lake ES

zan
Télécharger la présentation

Presentation to Jefferson Township Public Schools for Feasibility Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation • to • Jefferson Township Public Schools • for • Feasibility Study

  2. Agenda • Background • Findings • Recommendation Options • Timelines

  3. Background • Over 3,600 Students • 8 Facilities • Jefferson Twp HS • Jefferson Twp MS • White Rock ES • Stanlick ES • Milton Pre-K • Cozy Lake ES • Briggs ES • Drummond K • Serving Lake Hopatcong, Lake Shawnee, • Oak Ridge and Milton communities

  4. Option 1: • Board Offices move to Drummond School • Central Storage moves to new location to be determined • Kindergarten remains at Drummond School • Pros: • Low Costs – Does not require Referendum • Short Timeframe • Least Disruptive – All students remain in current locations • Cons: • Does not accommodate Central Storage • Does not accommodate existing day care center • Does not address any educational needs • Does not accommodate full day Kindergarten

  5. Option 1: Drummond School

  6. Option 2: • Board Offices move to Drummond School • Central Storage moves Drummond School • Kindergarten moves to Briggs School • Pros: • Board Offices and Central Storage are accommodated • Can accommodate existing day care center • Low Costs – Does not require Referendum • Short Timeframe • Administrative costs are reduced from two to one school • Cons: • Students are relocated • Does not address any educational needs • Does not accommodate full day Kindergarten

  7. Option 2: Drummond School

  8. Option 2: Briggs School

  9. Option 3: • Board Offices move to Drummond School • Central Storage moves Drummond School • Kindergarten moves to Briggs School • Expand Briggs to accommodate full day Kindergarten • Expand Milton to accommodate full day Kindergarten • Expand Cozy Lake to accommodate multi-purpose functions • Pros: • Board Offices and Central Storage are accommodated • Administrative costs are reduced from two to one school • Addresses all educational needs • Accommodates full day Kindergarten • Cons: • Students are relocated • Higher costs - Requires Referendum • Requires longer timeframe

  10. Option 3: Drummond School

  11. Option 3a: Briggs School

  12. Option 3b: Briggs School

  13. Option 3: Milton School

  14. Option 3: Cozy Lake School

  15. Timelines • Option 1: • Reconfigure Drummond School Summer 2010 • Relocate Board Offices to Drummond Summer 2011 • Vacate leased space Fall 2011 • Option 2: • Reconfigure Drummond School Summer 2010 • Relocate Kindergarten to Briggs School Summer 2011 • Relocate Board Offices to Drummond Summer 2011 • Vacate leased space Fall 2011

  16. Timelines • Option 3: • Reconfigure Drummond School Summer 2010 • Start Referendum Planning Fall 2009 • Submit Schematic Plans to NJDOE Spring 2010 • Referendum December 2010 • Relocate Kindergarten to Briggs School Summer 2011 • Relocate Board Offices to Drummond Summer 2011 • Start Construction on Additions Summer 2011 • Vacate leased space Fall 2011 • Complete Construction on Additions Summer 2012

More Related