1 / 32

Critical Design Review Presentation University of Louisville USLI January 31st, 2013

Critical Design Review Presentation University of Louisville USLI January 31st, 2013. Overall vehicle design. Final Launch Vehicle Dimensions: 117.0” Overall Length 6.0” to 5.0” Diameter Transfer 5:1 Von Karman Nose Cone. Main Material Selections: Fiberglass 6061-T6 Aluminum

zavad
Télécharger la présentation

Critical Design Review Presentation University of Louisville USLI January 31st, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Critical Design Review Presentation University of Louisville USLI January 31st, 2013

  2. Overall vehicle design • Final Launch Vehicle Dimensions: • 117.0” Overall Length • 6.0” to 5.0” Diameter Transfer • 5:1 Von Karman Nose Cone • Main Material Selections: • Fiberglass • 6061-T6 Aluminum • PETG Transparent Plastic • 6 Ply Birch Plywood Key Features: Locking Fins 3-Piece Modular Design Transparent Camera Section

  3. Final Motor selection Two half grains provide better takeoff acceleration! • Cesaroni 3 Grain: L995-RL • Projected Altitude: 5313 ft. • Max Acceleration: 229 ft/s2 • Burn Time: 3.66 seconds • Max Thrust: 1280 N • Average Thrust: 987 N • Total Impulse: 3618 Ns

  4. Flight stability Static Stability Margin: 1.77 Thrust-to-Weight Ratio: 6.11 Avg. / 7.73 Max Rail Exit Velocity: 65.3 ft/s Max Velocity: 606 ft/s or 0.54 Ma Max Acceleration: 229 ft/s2 Projected Altitude: 5,313 ft Dynamic Stability Margin shown in graph to left.

  5. Mass Statement • Initial Mass (with motor): 36.3 lbs • Initial Mass (without motor): 28.3 lbs • Burnout Mass: 31.82 lbs • Mass estimated with weight for every component. • Design set to use 28.3 pounds as target without compensation.

  6. CO2 Deployment System • Safer than black powder. • Less risk of parachute damage. • Mounted on nose cone bulkhead. • Machined from aluminum stock to meet team’s customized needs.

  7. How CO2 Device Works • Ignited by electric matches. Two e-matches used in each of the two systems. • About1 gram of black powder used per launch versus ~15 grams per launch last year. • Zero cleanup or soot buildup. • CO2 canister seal is punctured, allowing the trapped gas to expand and pressurize the airframe. • Aluminum casing doubles as shielding for all e-matches.

  8. CO2Device testing • Testing has been done on first CO2 device. • All CO2 gas ejects in about 1 second. • Use 0.5 grams of black-powder to propel plunger. • Ground test successfully separated subscale.

  9. Pressure vessel information • Manufacturer of 16gram CO2 cartridges is Leland Limited, Inc. • Factor of Safety for Burst Pressure (8000psi) vs. Max Expected Operating Pressure (1850psi) is 4.32:1 • Cartridges are disposable, therefore no fatigue cycles. • Patented Safety Sealing Cap acts as pressure relief device. • Built to Military Specification: MIL-C-603.

  10. Recovery altimeters • Redundant Featherweight Raven3’s will be used to initiate both CO2 systems. • Individually wired, Duracell 9 volt batteries will be used. • Individual magnet activated switches will be used for each altimeter. • Accelerometer based design means no vent holes will be needed in the cone.

  11. Continuous Disreefing System overview • Payload Objective: • Precisely control the descent velocity of the rocket. • Main parachute will be deployed at apogee, fully reefed. • Disk-Gap-Band • Drogue-assist deployment • Parachute will be allowed to open via prescribed descent velocities. • Allows for the elimination of a drogue parachute.

  12. Recovery harness • Upon deployment, nose cone/drogue will pull deployment bag out. • 20 inch SkyAngle Recon drogue. • Nose cone/drogue will dangle from rocket during descent. • Parachute will connect to a bulk head via two eyebolts. • To prevent twisting of the suspension lines. • Shock cord – 1 inch Tubular Nylon • Risers – 1 inch Tubular Nylon

  13. Reefed Parachute drag characterization • Adhere a force transducer to the parachute harness and the other side of the force transducer to a car. • Measure the force produced by drag with different vehicle velocities and dis-reefing ratios. • Parachute will be at least 5 vehicle widths away from the car. • Calculate drag coefficient via parachute geometry and force measurements. Connection Harness Force Measuring Device ~30 feet behind vehicle

  14. Tow Test Results • 7.3 – 44 ft/sec, 12.5-100% Disreefing was tested. • Higher speeds were not tested due to safety concerns • Over 60 data points obtained • A “Surrogate Drag Model” was created through a third order polynomial fit. • Believed the 7.3 ft/s 100% result is an anomaly. • CD may reduce with speed due to vehicle wake becoming larger.

  15. Kinetic Energy and Landing Velocity • Predicted 12 foot disk-gap-band will be required to meet minimum kinetic energy requirements. • 15% disreefment on deployment • Terminal velocity of 72 ft/sec • Disreefing begins at 2500 feet • Minimum “fully deployed” altitude of 500 feet. • Chosen configuration that keeps drift within competition boundaries. Controlled Peak Landing

  16. Drift calculations • Combination of Matlab and Open Rocket simulations were used. • Open Rocket – Used to find upwind drift during ascent. • Matlab – Used to find downwind drift with parachute after deployment. • Net drift was calculated.

  17. Subscale testing Procedure • Exact half-scale replica has been designed and constructed. • Testing plan includes: • H125 to 1433 feet with standard dual deployment. • I223 to 2256 feet with CO2 system. • I297 to 3066 feet with PCS system. • J425 to 4909 feet with Samsung Galaxy Exhibit. • Each test focuses on one portion of the overall design. Universal bay system allows the team to test each system .

  18. Subscale Test #1 – H125 • 4 foot disk-gap-band used on subscale flight. • No disreefing system. • Custom deployment bag. • Parachute was allowed to fully deploy. • Descent velocity of 18 ft/sec • Measured CD=0.81 • Predicted CD=0.83 • Line twisting was observed, due to rotation of the chute or parachute packing error. A beautiful dual deploy recovery!

  19. Subscale test – PCS (JAN 26th or Feb 2nd) • 4 foot disk-gap-band used on subscale flight. • Disreefing system will be integrated into subscale. • Fully capable of replicating full scale functionalities. • Will deploy main at apogee, at a disreefed ratio of 25%. • Parachute fully deployed by 500 feet. • Secondary “Main” will also deploy at 500. • Acts as emergency back up incase parachute does not disreef Line Drum Servo

  20. Parachute control system Algorithm

  21. Science mission directorate Payload • Utilization of a Samsung Galaxy Exhibit Android smart phone for SMD processing, communication, orientation measurements, photography • Real time data transmission over T-Mobile’s GSM network via SMS • Link with social media such as Twitter and live team website updates.

  22. SMD Payload • Only 6 distinct components, 8 total. Only 2 cables required. • Activated via SMS from ground station • Phone includes magnetometer, accelerometer, GPS, GSM connectivity, camera • Power class 1 GSM device. Transmission power capped at 1W. Actual power varies. • Android OS naturally modular in design, secure • IOIO affords phone multiple I/O, embedded protocol access • Redundant HackHDs for video recording

  23. IOIO Science Shield • Completely redundant atmospheric sensor arrays • Op amp photodiode amplifiers, not resistors • On board gyroscope • Communication via I2C • Diagnostic power LEDs • On board power switch • Seats directly to IOIO via perimeter headers (“Shield” concept)

  24. Smd payload integration • Laser cut SMD sled • Birch plywood construction • Fast prototyping • Vibration dampening • Ease of assembly with customized sizing for smartphone • Approximately 6” tall, 1.5” thick, 5.25” wide (30% size reduction) • Camera and light sensors centered vertically

  25. Propulsion Bay • Houses the motor and fin mounting. • Mates with the rest of the rocket for full motor access. • Fin thickness increased from 1/16” to 3/16” for added rigidity.

  26. A Motor retention • Allows separate removal of the motor and casing, from the fins. • Machined out of 6061 T6 Aluminum. • Added holes for further weight reduction. B

  27. Fin Mounting • Design uses no epoxy to secure fins in place. • Allows rapid replacement, with superior centering ability. • Machined on a CNC mill.

  28. Launch pad interface • Guide tower launch system. • Friction reduction to increase efficiency. No point of contact on the rocket. A .030” gap was determined between the rocket and the tower. • Leveling screws to allow for complete control over launch tilt. • Designed to be completely disassembled. • Blast deflection included.

  29. Safety and Launch procedures • Comprehensive checklist including: -Required tools -Step by step assembly instructions -Spaces for pre and post launch observations • Prior to launch, safety representatives will be selected who will be responsible for following all checklist steps and requirements. • Finalized checklist will be reported to the team Safety Officer. • Troubleshooting for all systems has been completed. Initial Here Sign Here

  30. Educational engagement • Middle School Water Bottle Rocket Competition -At Engineering Expo on March 2, 2013 -3 Award Categories • TARC Mentoring -Mentoring a local TARC team • Engineering is Elementary -Weekly volunteering at schools • Louisville Science Center • Multiple Boy Scout troop launches for the “Space Exploration” merit badge.

  31. 2012-2013 ExpensesAND funds For next year’s team!

  32. Status of Requirements Verification • Action Items: • Verify preparation time is no longer than 2 hours. • Successfully launch the full-scale rocket in its final flight configuration. • Verify actual kinetic energy is below 75 ft-lb upon landing. • Ground test SMD payload in final configuration. • Verify total vehicle reusability upon first test flight.