1 / 9

Test Management

Test Management. Eric Poiseau Inria , Rennes. Purpose. Provide support for the management of the connectathon process from registration to results Provide support for continuous testing over the internet. Requirements. Target : IHE Vendors Users. Where are we at ?. 3 CAT

zayit
Télécharger la présentation

Test Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test Management Eric Poiseau Inria, Rennes

  2. Purpose • Provide support for the management of the connectathonprocessfrom registration to results • Provide support for continuoustesting over the internet.

  3. Requirements • Target : • IHE • Vendors • Users

  4. Where are weat ? • 3 CAT • EU2009 (1/2), EU2010, NA2011, EU2011 • We have not yet met ourtarget for vendors and users.

  5. Specification Test Plan Specification Test Plan scenario scenario Test case Test case Test case Test case Test case Test case Profiles (IHE & epSOS) Profiles (IHE & epSOS) Test Management Test Management Profile Profile Test Plan description in Gazelle Test Plan description in Gazelle Profile Profile Profile Description Profile Description Peer to Peer Peer to Peer Workflow test specification Workflow test specification Peer to Peer Peer to Peer Data Data Workflow test specification Workflow test specification Peer to Peer test specification Peer to Peer test specification Data Data Workflow test specification Workflow test specification Actor Actor Data set Data set Actor Actor Actor Actor Orchestration Orchestration Systems Systems Simulators Simulators Systems Systems Simulators Simulators Systems Systems Test tools Test tools Simulators Simulators Operational test Operational test Proxy Proxy Validation Services (EVS) Validation Services (EVS) 5

  6. What’snext ? • Improve application performance • Improvememory usage • Ease Test assignement to monitors • RSS feeds for testers and managers • Easier installation, better documentation • Key Performance Indicator (KPI) Reports • Extends test grading by externaltools • Hook to GMM for vendor and users use cases

  7. Resources • In 2009 : 25 pm • In 2010 : 10 pm • In 2011 : estimation 7 pm

  8. Links and URL • Application : • http://gazelle.ihe.net/EU-CAT • http://gazelle-green.wustl.edu/IHE_North_America • Documentation • http://gazelle.ihe.net/content/gazelle-documentation • Support – Feature request • http://gazelle.ihe.net/jira/browse/GZL

More Related