1 / 1

BROKEN ARROW SOUTH LOOP BRIDGES

Oklahoma. Turnpike. Authority. Proposal No. _____. Contract No. CKT-1344. BROKEN ARROW SOUTH LOOP BRIDGES. The work to be performed under Contract Number CKT-1344 consists of constructing Section 4 bridges which are two span structures including five TPU bridges and two TPO bridges.

zazu
Télécharger la présentation

BROKEN ARROW SOUTH LOOP BRIDGES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oklahoma Turnpike Authority Proposal No. _____ Contract No. CKT-1344 BROKEN ARROW SOUTH LOOPBRIDGES • The work to be performed under Contract Number CKT-1344 • consists of constructing Section 4 bridges which are two span • structures including five TPU bridges and two TPO bridges. • These bridges carry vehicular traffic over the Broken Arrow • South Loop and West Branch of Broken Arrow Creek. The • bridges utilize concrete deck on prestressed concrete beams • consisting of 72-inch Bulb Tees (5,104 LF) of AASHTO • Type IV (8,185 LF). The bridge substructures utilize stub • abutments founded on steel H-piles along with concrete bent • frame piers founded on drilled shafts and pile footings. The • horizontal and vertical alignment of bridges consist of both • tangents and curves. • Additionally, the work to be performed consists of placing • pavement and subbase, installing guardrail and fencing, and • constructing driveways, drainage systems, topsoil and seeding • for E. 111th Street South, South 129th East Ave., South 145th • E. Ave., South 161st E. Ave. and South 177th E. Ave. The • work also includes removal of the detour roadways and grading at • E. 111th Street South, South 129th E. Ave., South 145th E. Ave., • South 161st E. Ave. CONSULTING ENGINEERS The Benham Group, Inc. 9400 North Broadway Oklahoma City, OK 73114 PREPARED BY HNTB Corporation 4608 South Garnett Road Tulsa, OK 74146 June, 1999

More Related