zelda-wallace
Uploaded by
32 SLIDES
417 VUES
320LIKES

Multi-State Locomotive Procurement Conference Details

DESCRIPTION

Important details and agenda for the Multi-State Locomotive Procurement Conference, including key information, agendas, and procurement processes. Make sure to follow the guidelines and schedule mentioned.

1 / 32

Télécharger la présentation

Multi-State Locomotive Procurement Conference Details

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Please Sign In! IDOT requires verification that attendees arrived on time for the Vendor Conference. You will also be asked to sign out.

  2. Welcome to theMulti-State Locomotive ProcurementVendors’ Conference August 22, 2013

  3. Housekeeping Location of restrooms and water fountains Nearest emergency exits and evacuation directions CPR-trained staff in attendance In the event of an emergency, IDOT staff will contact 911 and provide direction regarding evacuation or other necessary responses Please turn off or silence your cell phone Please note that this conference will be audio-recorded.

  4. Multi-State Procurement IDOT – Illinois Department of Transportation (Lead Agency) Caltrans – California Department of Transportation WSDOT – Washington State Department of Transportation FRA – Federal Railroad Administration (Funding Agency) NGEC – Next Generation Equipment Committee (Spec Development)

  5. Agenda

  6. Project Overview

  7. PRIIA • Passenger Rail Investment and Improvement Act of 2008 • Focused funding on Intercity Passenger Rail, including: • State Sponsored Routes • Amtrak Long Distance Routes • Re-Building Domestic Rail Manufacturing Base

  8. Federal Railroad Administration Support • Provides grant funding to: • Purchase locomotives and railcars • Improve rail infrastructure • Technical Assistance • Inspection and Review • Grant Management

  9. Next Generation Equipment Committee (NGEC) • Cooperative Working Group of Industry and Government (Federal, State, and Local) • Developed Technical Specifications for: • Locomotives (Tier 4 / 125 MPH) • Bi-Level Railcars • Single Level Railcars • Trainsets

  10. Bi-Level Railcar Procurement • Multi-State Procurement • Caltrans – Lead Agency • IDOT • Potential Options to include other Agencies/entities • FRA Grant Funding and Technical Assistance • NGEC Technical Specification • NTP November 2012 • Currently in Design Review

  11. Locomotive Procurement • Multi-State Procurement • IDOT – Lead Agency • Caltrans • WSDOT • Potential Options to include other Agencies/entities • FRA Grant Funding and Technical Assistance • NGEC Technical Specification

  12. Locomotive Procurement Overview

  13. Base Order Quantities *WSDOT may purchase an additional 3 locomotives via options depending on costs and available funding

  14. Potential Locomotive Options *The number of “Option Locomotives” shown in the table above are estimates of potential demand only and do not represent guaranteed future orders of option locomotives. The option quantities shown here are within the market quantity estimate developed by the NGEC for these locomotives **WSDOT may purchase an additional 3 locomotives via options depending on costs and available funding Option pricing revised by addenda may request quantity related pricing

  15. Locomotive Delivery Schedule

  16. Buy America • Support of domestic manufacturing base • Requires final assembly of locomotives in United States and use of domestic iron and steel • Encourages use of domestic component suppliers • FRA requires 100% domestic suppliers • Different from FTA requirements (60%) • Waivers will be considered but not encouraged • RFP requires Buy America compliance as part of Offer • 100% required to score all 8 points, none for <80%

  17. Standardization • NGEC encouraged development of standardization within the next generation fleet for purposes of: • Interoperability • Interchangeability • Management and reduction of life cycle costs • Improved safety • Re-establishment of the domestic supply chain for passenger rail rolling stock • RFP requires Standardization Plan as part of Offer • 100% required to score all points, no points for <45%

  18. Technical Specification & Customer Variables • Technical Specification for RFP is PRIIA Specification 305-005, Revision A (July 10, 2012) • Chapter 23 includes “Customer Variables” • RFP Attachment EE, Appendix E “Additional Customer Variables” includes: • Items common to all states • Items specific to each state • Items specific to long distance locomotive variant • Errata and other items

  19. RFP Overview

  20. Items to Pay Attention to… • Please be sure to properly complete the following often overlooked among all the RPM required items: • Attachment AA - State Board of Elections Registration • Attachment BB – Authorized to do Business in Illinois • Attachment CC – Illinois Department of Human Rights Public Contracts Number • Attachment II - Disclosure of Business Operations in Iran

  21. Procurement Schedule

  22. Communication During RFP Process All communications MUST be only with the Solicitation Contact DO NOT CONTACT ANY OTHER STAFF REGARDING THIS RFP All questions must be submitted on form CER 1 Any and all verbal communication is unofficial and non-binding

  23. Question and Answer Process Vendors can ask questions at this Vendors’ Conference All written questions must be submitted on form CER 1 After the Vendors’ Conference and prior to the Question submittal deadlines, all questions/CER 1 forms must be submitted via email to the Solicitation Contact All answers to questions will be published via addenda on the Illinois Transportation Procurement Bulletin The vendor that asked a question will not be identified in the answers or addenda. All vendors who have access to the Bulletin will have access to all addenda and questions and answers

  24. Addenda • RFP Addenda will contain: • All questions and answers • Changes to the RFP • Any other information that will be communicated to Vendors • All RFP Addenda will be posted on the Illinois Transportation Procurement Bulletin (Bulletin) • The Bulletin does NOT automatically notify Vendors of Addenda • Vendors are responsible for monitoring the Bulletin for any Addenda or other information

  25. Confidential Discussions and Revised Offers • If the Evaluation Committee deems it necessary, Offerors may be requested to: • attend Confidential Discussion to discuss issues with their initial Offers • submit Revised Offers • Offerors must attend Confidential Discussions in order to submit Revised Offers • If Revised Offers are requested, initial Offers will no longer be considered for evaluation or award however Offerors may resubmit their original Offer

  26. SBE Requirements • RFP Attachment NN is the Small Business Enterprises Participation and Utilization Plan • Proposals must include a utilization plan (uplan) demonstrating compliance with the 7% small business enterprises goal • Small businesses are defined in Attachment NN and include federal or state certified small businesses, veteran-owned small businesses, DBEs, etc. • There are no evaluation or technical points allocated for this provision but it is a pass/fail element of the proposal

  27. Buy America Waivers • Locomotive Final Assembly must be in U.S. (no waivers) • Buy America Component manufacturing must be in U.S., although waivers will be considered • Buy America Worksheet lists all Buy America Components • Identify domestic suppliers of all Buy America Components or request waiver(s) • Complete Waiver Request including form CER 2.8 • (see RFP Attachment EE, Appendix A, Section 1.3.2) • FRA will review and approve/deny waiver requests

  28. Buy America Pre-Award Audit Selected Offeror will have Buy America Component Suppliers audited to ensure Buy America compliance IDOT/Caltrans/FRA inspectors will review supplier manufacturing sites All must be found Buy America compliant before contract execution

  29. Vendor Questions and Preliminary Answers

  30. Vendor Questions 15 minutes for Vendor Questions ALL VERBAL RESPONSES ARE UNOFFICIAL AND NON-BINDING Any Official responses will be issued in writing via an Addendum on the Transportation Procurement Bulletin website by August 29, 2013

  31. Next Steps • Upcoming RFP dates: • August 29: First Addendum Issued • September 12: Last day for submitting questions prior to Offer due date • September 19: Last Addendum prior to Offer due date • October 3: Offer due date • Submit any additional questions on form CER 1 to Solicitation Contact Dante Watson

  32. Thank You for Attending Please sign out before exiting the meeting. IDOT requires verification that attendees stayed for the entire Vendor Conference.

More Related