2009-10 EGSI-TX Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Addendum to 2007 Planning Summit Presentation. 2009-10 EGSI-TX Proposed Transmission Reliability Projects. Longmire Reconfiguration. Longmire. Longmire 138 kV Substation Reconfiguration. Scenario:

ziva
Télécharger la présentation

2009-10 EGSI-TX Proposed Transmission Reliability Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entergy Gulf States, Inc.(Texas)Proposed Transmission Reliability ProjectsAddendumto 2007 Planning Summit Presentation

  2. 2009-10 EGSI-TX Proposed Transmission Reliability Projects Longmire Reconfiguration Longmire

  3. Longmire 138 kV Substation Reconfiguration Scenario: • The single contingency loss of 138 kV Line 596 (Longmire to Panorama) causes depressed voltage levels in the extreme Western Region. • The single contingency loss of 138 kV Line 94 (Grimes to Sota) or 138 kV Line 596 (Lewis Creek to Egypt) causes thermal overloads on 138 kV Line 96 (Longmire to Tubular). Recommended Solution: • Reconfigure Longmire 138 kV Substation to a 4 terminal station. Tap 138 kV Line 569 (Lewis Creek to Alden) and reroute into Longmire 138 kV Substation. Estimated Cost: $5 MM

  4. Longmire 138 kV Substation Reconfiguration REROUTE LINE 569 INTO LONGMIRE SUBSTATION 569