2008 Safety Performance

2. 4. 4. 12. 35. 2008 Safety Performance. A total of 5 lost time and restricted duty accidents resulted in an ENLARGED RATE = 7.5. Employee Fell in Parking Lot - LT. Arm strain – Assembly Area. Back Strain – Moving Guard Rail. Wrist Strain – Palletizing Shoulder Strain – Assembly

zizi
Télécharger la présentation

2008 Safety Performance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2 4 4 12 35 2008 Safety Performance A total of 5 lost time and restricted duty accidents resulted in an ENLARGED RATE = 7.5. • Employee Fell in Parking Lot - LT. • Arm strain – Assembly Area. • Back Strain – Moving Guard Rail. • Wrist Strain – Palletizing • Shoulder Strain – Assembly • Back Strain – Slip & Fall in WH- LT

  2. Safety Pyramid 2009 Actual → 2009 Goals 0 0 2 2 0 3 3 7 16 10 Assume 500k Man Hours June 17 YTD • 2 Slips & Falls Lost Time RestrictedDuty Recordable First Aid Near Miss L’Oreal Frequency Rate = 18 2

  3. Incident Analysis 2008 vs. 2009 YTD Root Cause (% of Total)

  4. Incident Analysis2008 vs. 2009 YTD Forklift Involvement (%)

  5. Incident Analysis2008 vs. 2009 YTD Employer Involved (%)

  6. 2009 Improvement Plan • OR S001 Compliance • Update physical layout and operational procedures to comply with ORS001 guidelines. • Liftor Training is in process, primary licenses in place for all PIT operators by YE. • High visibility vests and pedestrian aisle barriers completed. • Teams being developed for 3rd quarter plan refinement and implementation plan. • Increased involvement • Implemented SHE Steering committee • Additional employee committees on 2nd shift and in the offices. • General SHAP – In process, completion in July. • Supervisor Audits – Rolled out in May and refining process.

  7. 2009 Improvement Plan (cont.) • Increased SHE Communication • Standardized SHE Information & Communication Boards • Sharing of Accident / Incident Information • Energy Utilization Reductions • YTD > 12% Reduction verses last year same period. • Lighting and HVAC projects in process to drive greater savings.