1 / 13

2014 Drought Outreach Workgroup Introduction

2014 Drought Outreach Workgroup Introduction. Herald Zeitung August 13, 2013

zoe
Télécharger la présentation

2014 Drought Outreach Workgroup Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2014 Drought Outreach Workgroup Introduction

  2. Herald Zeitung August 13, 2013 The big spring ceased bubbling in mid-August, a victim, observers say, of the lingering drought and the increased pressure growth is putting on the Edwards Aquifer, the subterranean water supply that feeds the popular landmark in Landa Park.

  3. The purpose of the DOW is to consider and evaluate potential outreach strategies that could be utilized by Implementing Committee members in a coordinated manner to collaboratively raise awareness and understanding, by providing the public with information and updates about current drought conditions, HCP conservation measures and springflow protection measure implementation.

  4. These outreach strategies recommended, must have a specific date, flow level, index well level, river condition, or other defined trigger for implementation or distribution

  5. Each Implementing Committee member has appointed a representative • At any point the DOW members can request additional information to be presented • EAHCP PM will facilitate these meetings and give regular updates back to the IC • DOW will be organized on a consensus so in the event you are unable to make the meeting be sure your alternate is present.

  6. City of New Braunfels Steve Ramsey Alternate: Zac Martin City of San Marcos Jan Klein Alternate: TBD Edwards Aquifer Authority Elizabeth Smith Alternate: Terri Herbold Guadalupe-Blanco River Authority LaMarriol Smith Alternate: Todd Vottler Texas State University Shane Townsend Alternate: Emily Warren San Antonio Water System William Peche Alternate: TBD

  7. All recommendations are to be presented to the Implementing Committee on June 19th

  8. Retention of Services by John Bogges: • Communicate with workgroup members between meetings • Draft media outreach pieces • Recommend preferred media types • Provide marketing expertise as needed

More Related