Nuclear Power in Ireland: Facts and Fiction Philip W. Walton

Nuclear Power in Ireland: Facts and Fiction Philip W. Walton. UL, February 2012. www.bene.ie. M. King Hubbert (1956) “ Nuclear Energy and the Fossil fuels ”. Constraints in Ireland Global warming; must reduce GHG emissions Decline of fossil fuels - Peak oil (about now)

zona
Télécharger la présentation

Nuclear Power in Ireland: Facts and Fiction Philip W. Walton

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nuclear Power in Ireland:Facts and FictionPhilip W. Walton UL, February 2012 www.bene.ie

  2. M. King Hubbert (1956) “Nuclear Energy and the Fossil fuels”

  3. Constraints in Ireland • Global warming; must reduce GHG emissions • Decline of fossil fuels • - Peak oil (about now) • - Peak gas (≈2025) + shale gas • - Peak coal (≈2030) • - Energy Watch Group, Germany • 1999 Electricity Regulation Act (forbids NP)

  4. Advantages of Nuclear Power for Ireland • Negligible GHG or other emissions • (Dr. Fred Udo: Ireland’s CO2 increased with wind energy) • Virtually sustainable • Stable fuel suppliers (Canada, Australia) • Proven mature technology (13,000 reactor years) • Economic (cheaper electricity and spin off - see later) • No need for major grid modifications • 90% load factor (wind 30%, though 21.5% in 2010)

  5. Nuclear Power Worldwide • (January 2012) • 434 NPP’s in operation (15% of world’s electricity) • 61 under construction • 509 planned or proposed (Renaissance) • (Pre Fukushima number was 478) • 30 countries have NP and 19 proposing (others considering)

  6. Nuclear Power in some European Countries

  7. Nuclear Power in some non-European Countries

  8. Ireland’s target for electricity production • 40% electricity from renewables by 2020 (11% now) - primarily wind (variability problem) • - Eirgrid says instantaneous limit for wind is 50% • - limited hydroelectricity • - tidal power is limited (variable) • - wave power unproven (variable) - wind needs back up • - unchartered territory • - where does 60% come from? • 40% would need ~2000 windmills (120m high) • - €11bn (ESB) for grid expansion • - backup required (eg: 6th Feb, wind =16MW)

  9. Wind energy elsewhere Denmark; world leaders for 30 years - have ready back-up from Norway, Sweden & Germany - only achieves 9.7% from wind Spain; press reports “…50% during October..” - on one Sunday morning with low demand and favourable wind - actual average is 11%

  10. Spirit of Ireland (May 2009) initiative • “Natural Energy Power Station” • - wind turbines on West coast combined with • pumped storage in newly created reservoir(s) • Quoted specifications (tentative): • 700MW average power (1800MW installed wind) • lifetime; 25 years • storage energy; 100GWhrs • cost; €3.45bn • cost of electricity; 7.5 cents/kWh

  11. “Spirit of Ireland” power station (700MW) would require: • Approx. 600 wind turbines • (3MW each, 120m high) • 18 square kilometers of reservoir • (20m depth, 120m elevation) • €300m for “wiring”

  12. “Compare and contrast” SOI station to a nuclear power station

  13. Irish Academy of Engineering Study 2009

  14. Suitable nuclear reactors Westinghouse 225MW small modular reactor (SMR) - modular: factory manufacture - reduces costs - better quality control - advanced passive - 7 days safe operation after failure - available 2020 - scaled down version of AP1000 (PWR) - 24 months refuelling

  15. Suitable nuclear reactors (contd.) Pebble bed modular reactor (PBMR) - 210 MW (China building) - uses spherical fuel elements (“pebbles”) - high temperature gas cooled - inherently safe (natural convection adequate) - being developed in the USA & China - German technology International Framework for Nuclear Energy Cooperation (IFNEC)

  16. Official Irish bodies urging government to consider nuclear power; (selection of) • Eirgrid • Engineers Ireland • ESB strategy • ESRI Working Paper No. 229 • Forfas • The Irish Academy of Engineering • Irish Congress of Trade Unions (ICTU)

  17. Whither nuclear power for Ireland • Rescind amendment to Electricity Regulation Act (1999) which forbids nuclear power in Ireland • 2. Form an expert group to advise Government on Nuclear Power and energy post 2020 • - complex question with high wind penetration • - is NP suitable for Ireland? • - use of interconnectors to share NP with the UK or France? • - funding sources; AREVA (France)?, • ENDESA (Spain)?