An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monthly RCM Report David Thresher Frank Blankinship

  2. Agenda • Logic Diagram • Buildings Covered: 8116,8120,8110,8115 • Run to Fail items • MAS changes • RCM team concerns

  3. Logic Diagram • Expendable • Non critical • Under $7500 • Redundancy • Predicative Technology • Cost/Critical • What technology can be used (thermo, oil analysis, ultrasonic, voltage/ampere and vibration analysis)

  4. Run to Fail by Facility • 8116: 22 Items • Annualized MHRS: 25.6 Replacement Cost: $17,580 • 8120: 4 Items • Annualized MHRS: 4.5 Replacement Cost $2000 • 8115: 1 Items • Annualized MHRS: 1.2 Replacement Cost $970 • 8110: 89 Items • Annualized MHRS: 107.5 Replacement Cost $93,360 • TOTAL Items = 116 • TOTAL MHRS = $6,944 annually • TOTAL Material = $438 annually • TOTAL Savings = $7,381.85 annually

  5. Recommended MAS Changes by Facility • Building 8110: Recommended 30 items • Proposed savings 27 MHRS • Building 8116: Recommended 16 items • Proposed savings 2.6 MHRS • Building 8115: Recommended 8 items • Proposed savings 5.5 MHRS Total savings 35.1 MHRS = $1755 annually

  6. Recommended MAS Changes Base Wide • Recommended MAS changes to Air Handlers • Proposed savings 352 MHRS = $17,600 • Proposed Material savings = $59,657 • Total Savings = $77,257.00

  7. Concerns • Man Power • Supply System • Shop Cooperation • Training • Government Approval • Perception

  8. Summary • Facilities Reviewed = 4 • Total Items Condition Assessed = 619 • Total Proposed MHRS Saved = 529.3 • Total Proposed Savings = $84,664