1 / 19

Team JHK

Team JHK. Project TIC. Personnel. Supreme Commander Jarrod Marsh. Personnel. Mistress of Money, Transactions, and Work No One Else Wants to Do Hallie Baer. Personnel. Minister of Paperwork, Bureaucratic Nonsense, and Design Review Koren Smith. PDR Presentation. Team JHK

atira
Télécharger la présentation

Team JHK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team JHK Project TIC

  2. Personnel Supreme Commander Jarrod Marsh

  3. Personnel Mistress of Money, Transactions, and Work No One Else Wants to Do Hallie Baer

  4. Personnel Minister of Paperwork, Bureaucratic Nonsense, and Design Review Koren Smith

  5. PDR Presentation Team JHK Experiment TIC February 27, 2003

  6. Science Objective Our goal is to learn if IR radiation is dependent on temperature or altitude in the upper atmosphere. We are also going to study temperature as a function of altitude during ascent.

  7. Payload Design The payload will be constructed out of a BASIC Stamp and be connected to an infrared sensor and a thermistor. The sensors will be interfaced to the BASIC Stamp through an ADC channel. A timing chip will also be included to coordinate the data with GPS data taken by the balloon systems. There will be a camera facing the side of the box that will take pictures at certain intervals.

  8. Fabrication and Testing The first step will be to design the circuitry for the sensors and chips. While waiting for the parts to be delivered over the next several weeks, we will finish mounting all the basic components of the circuit. When the ADC, RTC, and sensors arrive, we will begin testing with an oscilloscope before we mount the chips. The final test will to suspend the payload above a surface and determine if the readings taken match the actual data.

  9. Fabrication Test List • Circuitry • Design • Construction and Testing • Testing • ADC • Attach power source • Input simulated data • Use oscilloscope to measure from output pin

  10. Fabrication Test List (cont.) • RTC • Attach power source • Send command to begin transmitting time • Use Basic Stamp to interpret signal

  11. Mission Operations The payload will be launched and tracked from the ground. Upon recovery the EEPROM will be downloaded and the data converted to temperatures and light intensities to determine if a correlation exists between the two.

  12. Weight Budget Item Weight CanSat 85g Thermistor 10g Sensor 300g Camera 30g Memory Chip 50g Warming Device 100g Total Weight 575g

  13. Data Analysis Temperature and IR light intensity will be measured every ten seconds during the flight. All data will be stored on board and recovered with the payload. Software needs to be developed to convert voltages from the sensors to temperature and IR light intensity.

  14. Power Budget Still waiting on specs for some parts

  15. Master Budget ItemEstimated CostInfrared Sensor $200 Thermistor $20Digital Camera $40 Warming Device $20 Memory Chip $20 ADC Chip $5 $305

  16. Timeline PDR 2 days Mon 2/24/03 Tue 2/25/03 Build PDR Presentation 3 days Tue 2/25/03 Thu 2/27/03 PDR Presentation 0 days Thu 2/27/03 Thu 2/27/03 Mardi Gras Break Begin Construction Design 5 days Mon 3/3/03 Fri 3/7/03 Receive and Install Sensors 5 days Mon 3/10/03 Fri 3/14/03 Install Power/ Begin Testing 5 days Mon 3/17/03 Fri 3/21/03 Work on CDR 4 days Mon 3/24/03 Thu 3/27/03 CDR Due 0 days Thu 3/27/03 Thu 3/27/03 Work on Interface 5 days Mon 3/31/03 Fri 4/4/03 Testing/ Begin Calibration 5 days Mon 4/7/03 Fri 4/11/03 Construction of Box 5 days Mon 4/14/03 Fri 4/18/03 Begin Preparation for Flight 5 days Mon 4/21/03 Fri 4/25/03 Work on FRR 4 days Mon 4/28/03 Thu 5/1/03 FRR Due 0 days Thu 5/1/03 Thu 5/1/03 Preparation for flight 5 days Mon 5/5/03 Fri 5/9/03 Final Exams 5 days Mon 5/12/03 Fri 5/16/03 Flight Operations 5 days Mon 5/19/03 Fri 5/23/03

  17. WBS See Handouts

  18. Credits 1.    Online Source: National Institute of Water and Atmospheric Research (NIWA), February 16, 2003, http://www.niwa.co.nz/edu/students/faq/layers 2.      Online Source: Online Journey through Astronomy, February 16, 2003, http://csep10/phys/utk/edu/astr161/lect/earth/atmosphere.html 3.      Online Source: NASA Website, February 16, 2003, http://liftoff.msfc.nasa.gov/academy/space/atmosphere/html 4.      Online Source: Earth Zone Website: Absorption, Radiation, & Greenhouse, February 23, 2003, http://207.10.97.102/earthzone/lessons/07meteor/greenhouse.html 5.      Online Source: University of Chicago, February 23, 2003, http://geosci.uchicago.edu/~archer/EnvChem/Labs/modtran.lite.html 6.      Online Source: Caltech University, February 23, 2003, http://www.ipac.caltech.edu/Outreach/Edu/infrared.html 7.      Online Source: Seiko Instruments, February 23, 2003, http://www.sih.com.hk.html 8.      Catalog Source: Edmund Industrial Optics, Optics and Optical Instruments Catalog, 2002, p. 191 Online Source: US Sensor Corporation, February 23, 2003, http://www.ussensor.com/products/precintr.html

  19. And of course… Thanks to the JHK team for putting up with me…