1 / 47

Feedback On Nanosecond Timescales

Feedback On Nanosecond Timescales. Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez Colin Perry Graduate students: Christina Swinson Ben Constance Robert Apsimon Douglas Bett Alexander Gerbershagen Angeles Faus Golfe Javier Alabau CERN, DESY, KEK, SLAC.

Télécharger la présentation

Feedback On Nanosecond Timescales

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Feedback On Nanosecond Timescales • Philip Burrows • Glenn Christian • Hamid Dabiri Khah • Javier Resta Lopez • Colin Perry • Graduate students: • Christina Swinson • Ben Constance • Robert Apsimon • Douglas Bett • Alexander Gerbershagen • Angeles Faus Golfe • Javier Alabau • CERN, DESY, KEK, SLAC P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  2. FONT4/5 prototypes at KEK/ATF2 Kicker BPM 1 BPM 2 BPM 3 e- 1.3 GeV Drive amplifier Analogue BPM processor 3 bunches, 140-154ns spacing Digital feedback P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  3. FONT4 prototype at KEK/ATF Kicker BPM 1 BPM 2 BPM 3 e- Drive amplifier Analogue BPM processor Digital feedback P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  4. BPM processor 2007 2005 2006 P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  5. Digital Feedback Board JTAG port PROM Xilinx Virtex4 FPGA 40 MHz oscillator GP I/O Header Analog Devices ADC/DACs RS232 comms 2 x Analog Output channels (differential) 4 x General-purpose digital outputs 2 x Analog Input channels (single-ended) 3 x external clock/trigger inputs P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  6. Kicker driver amplifier • Specifications: • +- 15A (kicker terminated with 50 Ohm) • +- 30A (kicker shorted at far end) • 35ns risetime (to 90%) • pulse length 10 us (specified for 20-60 bunches) • repetition rate 10 Hz • Outline design done in Oxford • CASE studentship w TMD Technologies • Order placed with TMD Sept 06 • Two prototype units delivered Dec 06 • 2 units in service at KEK since 2007 • (2009: upgrades made + 1 unit) P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  7. FONT4 status • FONT4 basic operation demonstrated in 2008 running: • beam feedback along single axis (y) with few micron resolution P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  8. FONT4 status • FONT4 basic operation demonstrated in 2008 running: • beam feedback along single axis (y) with few micron resolution P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  9. FONT operations in 2009 • FONT4 installation was dismantled when ATF extraction line was reconfigured late 2008 P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  10. ATF2 FB system: FONT5 • Dedicated • system: • 2 stripline • kickers + • fast drive amplifiers • 3 stripline BPMs + • fast analogue front-end electronics • 9-channel digital FB processor P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  11. ATF2 FB system: FONT5 • Dedicated • system: • 2 stripline • kickers + • fast drive amplifiers • 3 stripline BPMs + • fast analogue front-end electronics • 9-channel digital FB processor P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  12. ATF2 FB system: FONT5 • Dedicated • system: • 2 stripline • kickers + • fast drive amplifiers • 3 stripline BPMs + • fast analogue front-end electronics • 9-channel digital FB processor P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  13. FONT5 operations in 2009 • FONT4 installation was dismantled when ATF extraction line was reconfigured late 2008 • 3 new BPMs and 2 new kickers installed in new ATF2 extraction line week of February 9 P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  14. New FONT5 ATF2 hardware P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  15. FONT5: Jan-May 2009 • FONT4 installation was dismantled when ATF extraction line was reconfigured late 2008 • 3 new BPMs and 2 new kickers installed in new ATF2 extraction line week of February 9 • Main aims: • 1) commission new BPMs and kickers (digital DAQ) • 2) work on improved resolution  1 um level • 3) understand beam dynamics in FONT region • Much commissioning work done parasitically - now have FONT ‘standalone’ hardware • We typically took 1 shift per week March - May, a total of 6 shifts (!) P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  16. Example: BPM calibrations P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  17. Example: kicker calibration Kick of +-40 urad 6

  18. Example: resolution vs. bunch Q P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  19. Phase stability of 357 vs. 714 MHz • We take 714 MHz signal from machine as LO signal for down-mixing of BPM signals • Frequency divide 714 MHz to obtain 357 MHz for clocking the FONT digital FB board • We observed phase jumps between 357 and 714 MHz signals P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  20. Phase difference of 714 and 357 MHz signals Phase jumps P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  21. Phase stability of 357 vs. 714 MHz • We take 714 MHz signal from machine as LO signal for down-mixing of BPM signals • Frequency divide 714 MHz to obtain 357 MHz for clocking the FONT digital FB board • We observed phase jumps between 357 and 714 MHz signals • A 180-degree shift of 357 MHz would cause ADC sample to miss beam by 2.8ns  reduce signal by up to 50% • We tried ‘stable’ source of 714 MHz derived from frequency generator phase-locked to master oscillator P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  22. Comparison of ‘stable’ and ‘unstable’ 714 MHz P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  23. FONT5 since June 2009 • New FONT5 9-channel FB/FF board (y, y’) assembled (Sept. 2009) • Bench tested in Oxford (October) • Sent to KEK (November) for beam tests • Shipped back and repaired (1 week turnaround) • Now undergoing further beam tests • looks very promising P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  24. Single bunch calibration: November 19 24 P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  25. Single bunch calibration: P3 problem November May 25 P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  26. P3 problem • Bottom stripline had 20 db lower response • Pickup removed from beamline and examined during November down week • Lot of dust found inside! • Noticed that bottom electrode closer to BPM housing than other electrodes – fabrication error? • BPM rotated by 90 degrees and reinstalled • Will be replaced in December shutdown • BPM had been removed in summer for welding of bellows: probably rotated by 90 degrees then P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  27. ZV6X corrector setting: May

  28. ZV6X corrector setting: November

  29. FB loop closed on on off off Ben Constance 27th November 2009 2

  30. Interleaved FB on/off mode 27th November 2009

  31. Interleaved FB on/off mode 1 off/on 27th November 2009

  32. Interleaved FB on/off mode 2 off 1 off/on 27th November 2009

  33. Interleaved FB on/off mode 2 on 2 off 1 off/on 27th November 2009

  34. Interleaved FB on/off mode 2 on 3 off 2 off 1 off/on 27th November 2009

  35. Interleaved FB on/off mode 3 on 2 on 3 off 2 off 1 off/on 27th November 2009

  36. FB loop closed on on off off Ben Constance 27th November 2009 2

  37. Beam issues • Banana-shaped train • studies to see if train can be extracted flat • ‘flattening’ signal implemented in firmware • Significant bunch-bunch jitter within train • Bunches 1 and 3 typically poorly correlated • studies to understand origin of decorrelations P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  38. Extraction kicker timing studies

  39. Beam jitter/correlation studies18 November 2009, Std Optics, 3 train, 151.2 ns BS (with FONT4 electronics, P1 & P2 only)‏ Mean position and RMS jitter at P2: Bunch1: 68.9 +/- 5.1 um Bunch2: 59.4 +/- 4.7 um Bunch3: 46.3 +/ 5.0 um RMS sagitta wrt train mean: 11.3 um Bunch-to-bunch correlations at P2: B1/B2: 0.76 B2/B3: 0.77 B1/B3: 0.78 resolution < 2.3 um, based on jitter and correlation observed. P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  40. Beam jitter/correlation studies11 December 2009, Std Optics, 3 train, 151.2 ns BS (with FONT5 electronics - P1, P2, & P3)‏ Mean position and RMS jitter at P2: Bunch1: -91.7 +/- 18.4 um Bunch2: -80.9 +/- 16.7 um Bunch3: -91.3 +/ 15.7 um RMS sagitta wrt train mean: 6.1 um Bunch-to-bunch correlations at P2: B1/B2: 0.48 B2/B3: 0.75 B1/B3: -0.02 (non sign.)‏ 3-BPM resolution estimates: B1: 3.9 um, B2: 3.3 um, B3 3.4 um P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  41. Beam jitter/correlation studies11 December 2009, Std Optics, 3 train, 151.2 ns BS, AFTER DR CHROMATICITY CORRECTION Mean position and RMS jitter at P2: Bunch1: -90.7 +/- 15.1 um Bunch2: -82.6 +/- 14.3 um Bunch3: -94.6 +/ 17.0 um RMS sagitta wrt train mean: 6.1 um Bunch-to-bunch correlations at P2: B1/B2: 0.42 (non sign.)‏ B2/B3: 0.60 B1/B3: -0.07 (non sign.)‏ 3-BPM resolution estimates (low stats): B1: 3.6um, B2: 2.9 um, B3: 2.8 um P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  42. Bunch correlations vs. DR RF scan11 December 2009, Std Optics, 3 train, 151.2 ns BS, ~50 pulses/setting P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  43. Bunch correlations vs. beam charge11 December 2009, Std Optics, 3 train, 151.2 ns BS, ~100 pulses/setting P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  44. FONT5 summary 2009 • New BPMs and kickers installed + working • FONT5 FB board fabricated and commissioned • FB loop closed • Beam quality is a serious issue: • banana-train can be tuned away (or corrected) • large jitter and • lack of correlation between bunches are major • problems • (sometimes jitter is small and well correlated!) • THIS WILL NOT BE BETTER WITH 30 BUNCHES! P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  45. Valencia Movers P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  46. +- 2.5 mm horizontal +- 2mm vertical P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

  47. FONT plans: 2010 • Install Valencia movers (January) • Provide ‘turn-key’ bunch-by-bunch FB system for • achievement of ATF2 goals • Plan to replace LO-based BPM processor scheme P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09

More Related