1 / 2

APEX case for beam time

APEX case for beam time. Well optimized: LW/F is best for E A / E beam near 1, for a’ > 10 - 7 Will cover a wide mass range with 30-100 higher sensitivity Test run showed that the experimental setup works Ready to run with full L except possible 30% reduction for 3.3 GeV part

haig
Télécharger la présentation

APEX case for beam time

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX case for beam time Well optimized: LW/F is best for EA/Ebeam near 1, for a’ > 10-7 Will cover a wide mass range with 30-100 higher sensitivity Test run showed that the experimental setup works Ready to run with full L except possible 30% reduction for 3.3 GeV part Analysis code for the wire chamber needs more work toboost HRS-L efficiency > 60% Iron beam line inside the septum magnet needs to be designed and constructed Target foil holders (and foils) for each kinematic setting needs to be constructed Completion of Test Run analysis (publication) Collaboration has required resources, need new HW ~ $25k

  2. APEX case for beam time APEX is ready to take data on 1-2 months notice APEX could be the first experiment of A’ search program at Jlab

More Related