An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Readiness Liaison Update Erin Jester September 26, 2013

  2. Contents • Readiness Metrics • Readiness Metrics Inventory • Edits to Readiness Metrics • Parallel Operations Go/No-Go Updates • Update on MP Self-Certification

  3. Readiness Metrics Updates • Readiness Metrics Inventory is posted in the Readiness workstream folder • List of metrics, with high level info (e.g. if it is currently tracking, target completion date, etc.) • Two tabs: • External FERC Metrics • External Non-metrics reporting

  4. Readiness Metrics Updates (Cont.) Clean and redline version of Readiness Metrics is posted in the Readiness workstream folder • New Readiness Metrics • OPS-05a, OPS-05b, OPS-05c, OPS-14, OPS-15, OPS-16, OPS-17, OPS-18, STL-07, TCR-06 • Edited Readiness Metrics • TRL-01, TRL-03, OPS-06a, OPS-06b, OPS-06c, OPS-12

  5. Parallel Ops Go/No-Go Criteria Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  6. Parallel Ops Go/No-Go Criteria Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.

  7. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  8. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.

  9. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  10. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  11. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  12. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  13. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  14. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:

  15. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.

  16. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.

  17. Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. Two new criteria:

  18. Update on MP Self-Certification