An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa

  2. MuTRIG-FEE Install (Station-1) Completed Oct. 27

  3. Station-2&3 Installation Completed by Oct.29

  4. ADTX Installation Check List • Miscabling • Visible inspection   • Gap-by-Gap calibration logic/mask check  • ADTX Performance   • Dead (single) channel check  • Board ID check   • Slow control (threshould 10mV, 30mV)   • PROM erase and Download  • Efficiency   • Fake hit   • Timing   • MuTR FEE Performance • Noise w/o HV   • HV upto 1500V (st-1), 50V (st-2&3) w/ Ar-CO2 gas  • Minor Tweak of Cable to improve noise  • Noise w/ HV on  • Gap-by-Gap calibration  found one miscabling in St-1, Oct.5 • Gain  stereo ~ 1, non-stereo~0.9   • LV • Miscabling  • LV measurement at Chassis with all other power on 

  5. Impact on MuTR Pedestal

  6. Csplit = 100pF Csplit = 30pF w/o ADboard ○ MuTR Resolution vs. Noise Achieved : 200 ~300um Intrinsic 100um Pedestal RMS/MIP

  7. MuTR Pedestal RMS Distributionbefore/after ADTX Install Typical Pedestal RMS Distribution of MuTR Pedestal RMS Strip Number

  8. Gap-1 Gap-2 Gap-3 MuTR Pedestal Station-1 Oct.1 Oct.2 Oct.3 Run9 Oct.4 Present Oct.5 Oct.6 Oct.7 Oct.8 stereo Non-stereo stereo Non-stereo stereo Non-stereo

  9. MuTR Pedestal Station-2

  10. Station-3 Octant-2 Noise after before

  11. Aluminum Foil Shield on Station-3 Chamber

  12. Station-3 Aluminum Foil Effect w/o foil w/ foil

  13. MuTrig Performance • With Calibration Pulse • Timing • Efficiency • Miscabling Check • Logic Test • Without Calibration Pulse • Fake hit rates

  14. ADTX Timing (Gap-1) Strip# Strip# Strip# Strip#

  15. ADTX Efficiency (Gap-1) 1 efficiency 1 efficiency 1 efficiency Strip# Strip# Strip# Strip#

  16. ADTX Timing (Gap-2)

  17. ADTX Efficiency (Gap-2)

  18. ADTX Timing (Gap-3)

  19. ADTX Efficiency (Gap-3)

  20. Fake Hit Rate (Threshold=20mV)

  21. LL1 Trigger Readiness LL1 Board • Communication test  • LL1 Board Production by end of October • ADTX - MRG - LL1 - GL1 chain test this November. • New high momentum trigger will be operated in Run10 for commissioning MuTRG-MRG Boards

  22. DCM For Run10 Operation, 2 more FE3 were obtained from : FOCAL Colorado

  23. Re-Capacitation Station-1 Station-2

  24. Summary • Installation to South Arm is completed.