An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of Annex A for WP1 - status • discussion on requirements for Annex A (CD, DJ, SH) in Oxford last Thursday • drafted a table of tasks and effort required, and a corresponding GANTT chart • (see following pages) • arrive at an estimated additional manpower requirement for WP1 of • 3 RA’s full-time (or up to 6 at 50% on WP1) starting in Oct ‘05 Overview of tasks for WP1 – Simulation and Physics Studies subdivide the ‘MIPs to physics’ programme as follows: MIPS to tracks 64.5 staff months (SM) Tracks to vertex information 65.5 SM Physics studies 68.6 SM

  2. MIPs to tracks 1.1 GEANT work: standalone tests of multiple scattering in GEANT4 2 SM track propagation -> realistic hit positions in sensors 4 SM develop new GEANT descriptions of detector config’s 2.5x 6SM/yr  21 SM 1.2 charge generation 3 SM  3 SM 1.3 charge collection: 3D lookup, B-field (ISE-TCAD?) 6SM + 3x 1SM/yr  9 SM 1.4 cluster finding, sparsification 6SM + 4.5SM later  10.5 SM 1.5 track fitting 6 SM  6 SM 1.6 obtain covariance matrix from tracks 3 SM  3 SM 1.7 integration of ‘MIPs to tracks’ package into SGV, test/verification 6SM maintenance 2x 3SM/yr  12 SM

  3. Tracks to vertex information 2.1 update from ZVTOP (ghost track alg., 1 prong vertices) 3 SM + 3.5SM later  6.5 SM 2.2 use of vertex information to improve jet finding 4 SM + 3x 1SM/yr  7 SM 2.3 NN-based flavour tag and vertex charge reconstruction 6 SM + 3x 2SM/yr  12 SM 2.4 extension to neutral B´s, e.g. charge dipole 6 SM + 2x 2SM/yr  10 SM 2.5 recovery algorithms for special topologies: 6 SM + 2x 1SM/yr  8 SM semileptonic decays Kaon, Lambda identification use of neutral energy 2.6 study of polar angle dependence 6 SM + 2x 2SM/yr  10 SM 2.7 alignment issues 12 SM  12 SM

  4. Physics studies for details on processes see current draft of proposal section on physics 3.1 standard model processes  21 SM 3.2 Higgs physics  23 SM 3.3 SUSY processes  24.6 SM GANTT chart • unless otherwise specified, each block in the GANTT chart on the next page • corresponds to 50% of a person´s time • for further comments on the GANTT chart, see p6

  5. FY 05 / 06 FY 06 / 07 FY 07 / 08 FY 08 / 09 FY 09 / 10 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M 1.1 GEANT work 1.2 charge generation 1.3 charge collection 1.4 cluster finding, sparsific. 1.5 track fitting 1.6 covariance matrix 1.7 integration into SGV, test 2.1 update from ZVTOP 2.2 vertex info for jet finding 2.3 flavour tag, Qvtx (NN) 2.4 neutral B´s (chg dipole) 2.5 special topologies 2.6 polar angle dependence 2.7 alignment issues 3.1 standard model channels 3.2 Higgs physics 3.3 SUSY processes Task 1.7 in Oct 06 – Mar 07: 2 x 50% of an FTE Task 3.3 in Apr 05 – Sep 06: 20% of an FTE (scalar top analysis currently underway)

  6. GANTT chart - comments • start with concerted effort on ´MIPs to tracks´ package as soon as new RA´s are recruited • in parallel continue with work on ´tracks to vertex info´ (so far main focus of LCFI physics WP) • and update these tools once the ´MIPs to tracks´ package is in place • when all tools are available, focus shifts to work on overall detector design based on studies • of physics channels that are expected to be sensitive to vertex detector performance • 1.4 in 3, 4 of FY 07/08: include new info from CPR3 (and CPR-ISIS3?) – cf Konstantin´s chart • 1.1 in FY 07/08, 08/09: develop GEANT descriptions of various detector designs ( WP6) • 1.2 in FY 07/08: include new results regarding sensor development • 2.4-2.6 in FY 06/07: based on standard SGV (SGV only) • 2.4-2.6 in FY 07/08: based on SGV + ´MIPs to tracks´ package • physics studies: when work on one channel reaches conclusion, start with next • start Higgs June 06: person who has become an expert in track-jet assignment • might like to continue with e.g. ZHH multi-jet events • timing of ramp up (Oct 06): ´manpower release´ from MIPs to tracks

  7. Manpower senior staff / supervision Oxford lecturer 0.2 / yr (?) Dave J 0.2 / yr (?) Sonja ~ 0.5 / yr Dave B 0.2 / yr (?) Andre 0.3 / yr (?) Chris 0.5 / yr (?) active workers Dave B 0.1 / yr (?) Alex 0.2 / yr Sonja ~ 0.5 / yr 3 – 6 new RA´s equivalent to 3 / yr