VELO-installation September 7, 2006

VELO-installation September 7, 2006. installation of exit window + part I of the beam pipe logging of vacuum data what’s next. August 14: opening of RICH1-side of VELO-tank to install exit window with w.f.s. + beam pipe part I. Installation of new/longer w.f.s.

tyson
Télécharger la présentation

VELO-installation September 7, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VELO-installation September 7, 2006 • installation of exit window + part I of the beam pipe • logging of vacuum data • what’s next VELO

  2. August 14: opening of RICH1-side of VELO-tank to install exit window with w.f.s. + beam pipe part I VELO

  3. Installation of new/longer w.f.s. VELO

  4. Installation of exit window + beam pipe VELO

  5. What’s next ?? • Perform vacuum tests (venting with Ar, mass spectra, etc.) • (≈ end of September) • Get PVSS implementation running • Measuring ((x,y,z) + leaktest) and manipulating of rf-boxes @ NIKHEF • Apply NEG-coating on rf-boxes • Organize clean + adequate working place for rf-box mounting • Uninstall bellows • Perform various repairs (see next slide) • Combine bellows + rf-boxes • Measure geometry • Install bellows + rf-boxes • Perform extensive vacuum tests • Check positioning VELO

  6. baratrons Repair list + 1 motion axis to be replaced VELO