Acceleration & Innovation Workshop: SRF technology

Acceleration & Innovation Workshop: SRF technology. Chris Compton SRF Engineer 10-8-10. Outline. SRF Technology for FRIB SRF Linac SRF Cryomodules SRF Cavities Some FRIB numbers SRF Technical Development Cavity Frequency Control Magnet Systems Thermal Systems Diagnostics

Albert_Lan
Télécharger la présentation

Acceleration & Innovation Workshop: SRF technology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Acceleration & Innovation Workshop:SRF technology Chris Compton SRF Engineer 10-8-10

  2. Outline • SRF Technology for FRIB • SRF Linac • SRF Cryomodules • SRF Cavities • Some FRIB numbers • SRF Technical Development • Cavity Frequency Control • Magnet Systems • Thermal Systems • Diagnostics • SRF Infrastructure • Cleanrooms (Class 10,000 and Class 100) • Ultra-pure water • Chemical etching Facility • Cryogenic testing (Dewars and Cryogens) • Electronic test equipment (network analyzer and Signal generator) • Modeling software C. Compton, 8 Oct. 2010

  3. FRIB SRF Linac C. Compton, 8 Oct. 2010

  4. SRF Cryomodules • Cryomodule subassemblies fabricated in industry Magnetic Shield C. Compton, 8 Oct. 2010

  5. FRIB Cavities • FRIB Cavities will be fabricated in industry • Fabricated from high purity niobium HWR, Beta=0.53 subassemblies QWR, Beta=0.0.085 subassemblies C. Compton, 8 Oct. 2010

  6. FRIB numbers • 52 cryomodules required for FRIB driver linac • 4 main cryomodule types • 3 matching cryomodules • 344 cavities required • 4 cavity types • 79 solenoids • QWR, 80.5 MHz, beta=0.041 • QWR, 80.5 MHz, beta=0.085 • HWR, 322 MHz, beta=0.29 • HWR, 322 MHz, beta=0.53 = Cavity QWR 80.5 MHz Beta=0.041 QWR 80.5 MHz Beta=0.085 HWR 322 MHz Beta=0.53 HWR 322 MHz Beta=0.29 = Solenoid C. Compton, 8 Oct. 2010

  7. Cavity Frequency Control • The cavity is driven by an RF amplifier at the accelerator’s RF frequency of 80.5 MHz or 322 MHz • Mechanical movements can shift the cavity’s frequency, requiring additional external power to maintain operational parameters • Mechanical movement is caused by surrounding conditions • Mechanical vibrations (i.e. pumps, compressors) • Pressure fluctuations from the cryogenic plant • Mechanical movement must be mitigated or compensated C. Compton, 8 Oct. 2010

  8. Cavity Frequency Control • Cavity Tuner – used to mechanically tune cavity to desired frequency • Design challenges • Minimize backlash in tuner • Precision stepper motor control • Piezo actuators • Feed-back system • Mechanical isolation • Damper systems to isolate noise sources (i.e. pumps, compressors) • Isolate cryomodules C. Compton, 8 Oct. 2010

  9. Magnetic Systems • Magnetic Shielding • Cavity performance is sensitive to magnetic fields • Cavity must be shielded from both solenoid and earth fields • Magnet leads • Current design uses vapor cooled leads (4.5K operation) • Redesigning lead cooling method to meet FRIB cryogenic plant parameters • Alternative: redesign with HTC leads (possible 2K operation) • Magnetic Degaussing • Degauss cycle to remove possible trapped flux C. Compton, 8 Oct. 2010

  10. Thermal Systems • Thermal shield development • Current design uses a copper thermal shield • Redesign under investigation to use aluminum for production • Static load mitigation • Thermal intercept design • Cryogenic flow and cooldown • Cryomodules to be cooled quickly (operational schedule) • Cavity to be cooled quickly (cavity performance) • Plan to pre-cool parts (solenoids, etc) with cavities still warm C. Compton, 8 Oct. 2010

  11. Diagnostics • Temperature sensors at cryogenic conditions • Mounting techniques not yet perfected • Magnetic Probes • Wide range desired • Electrical feed-throughs under cryogenic conditions • Feed-through with direct contact with cryogenics (superfluid) • X-ray monitoring and imaging • Used to diagnose performance • Have investigated techniques to localize field emitters with x-rays C. Compton, 8 Oct. 2010

  12. SRF Infrastructure • Cleanrooms (Class 10,000 and Class 100) • 1,000 sq.ft. • Ultra-sonic cleaners plumbed with ultra-pure water • Ultra-pure Water • Supplied at ~ 18 MΩ-cm • Chemical Etching Facility • Cryogenic Testing (Dewars and Cryogens) • Liquid helium (4.2K) supplied by cryoplant • Sub-atmospheric system allows testing to ~1.5K • Cleanroom to Dewar transfer ability • RF Testing (phase feedback loop, amplifier, etc) • Modeling Software • Mechanical structure – Ansys, Solidworks • Electro-magnetic – Analyst • Dynamic – CFX, Fluent C. Compton, 8 Oct. 2010

  13. Contacts • For further information please contact: • Matthaeus Leitner – Chief Engineer - lienter@frib.msu.edu • Walter Hartung – SRF Physicist - hartung@frib.msu.edu • Chris Compton – SRF Engineer – compton@frib.msu.edu C. Compton, 8 Oct. 2010