Schedule Shutdown’s

Schedule Shutdown’s . MS1, MS2, MS3, NS0, NS1, NS2, MS4. Typical Problems Found: Bad HV Switch Operators Bad Heaters Some HV Cable Corona Bad 500 Amp Molded Case Breaker Rusted Out Cubical 480 Volt Main Breakers Failing to reclose – trip rod device hangs up.

Ava
Télécharger la présentation

Schedule Shutdown’s

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedule Shutdown’s MS1, MS2, MS3, NS0, NS1, NS2, MS4

  2. Typical Problems Found: • Bad HV Switch Operators • Bad Heaters • Some HV Cable Corona • Bad 500 Amp Molded Case Breaker • Rusted Out Cubical • 480 Volt Main Breakers Failing to reclose – trip rod device hangs up

  3. At Y-ML5, termination mismatch – shield is above the stress cone of the back cable – corona found. Corrective – re-tape and increase spacing between cables

  4. At Y-ML6, Y-ML5, and Y-ML10 – rusted interiors on the side that is next to the roadway

  5. At Y-ML6, Y-ML5, and Y-ML10 – Some of the correctives used on the rusted Interiors.

  6. Typical Allis-Chalmers 1500KVA Substation Low Voltage 480 Volt Section High Voltage Section

  7. On Y-ML10, Bad High Voltage Switch Operator (Was replaces with operator from NS4 NL6A )

  8. Stock Photo of HV switch operator

  9. On Y-ML10, “A” Phase fiberglass operator broke after several switch operation during the replacement of the failed high voltage switch operator. Failure point