An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME Bhama Consultancy Services , Pune START

  2. Presentation on Completion and Operation of Sangola Branch Canal Location: Date: -

  3. Index Map for NRBC

  4. Index Map For Sangola Branch Canal (SBC)

  5. Components of SBC Project

  6. Special Problems in SBC Project The situation specific problems which compel the need for TAMC Services are as follows: a) Import and Use of Modern canal liningTechnology from USA for carrying out the canal liningunder water for the continuously flowing NRBC through out the year b) Restrictions on use of natural sand and its replacement by crushed sand including concrete mix designs c)Strong opposition from the farmers in existing established perennial irrigation belt under the pretext of adverse effects on their established economy as canal lining will reduce water supply to their established irrigation cropping pattern. This concerns vitally and needs intensified efforts in this regard, to make a dialogue with concerned farmersthrough frequent and consistent persuasion for eradicating the fear of concerned farmers, and d)Regular and frequent (at least bimonthly or quarterly) review meetings of all concerned participants and stake holders by competent catalyst Agency for proper coordination and monitoring in light of above (a),(b) & (c)

  7. Flow Chart

  8. Proposed Work Plan Schedules Annexure 1.1 Annexure 1.2 Annexure 1.3 Annexure 1.4

  9. Performance Domain

  10. In Place Lining Prototype Project Coachella Canal Imperial Country California

  11. Canal Lining

  12. Modified Equipment Version

  13. CONSTRUCTION ACTIVITIES • Earthwork • Trimming • Discharging Water And Dredge Cuttings • Equipment Position • In- Place Lining • Lining Upstream Vs Downstream • Pressure Plates- Computer Monitoring • Pvc Guide System • Concrete • Quality Control • Concrete Conveyance System • Concrete Joint Construction • Concrete Slump Variations • Concrete Mix Design • Work Berm • Elevation Of Canal Surface Water • Slope Requirement

  14. Key Associates • SBC is economical backbone for Sangola • Tehisil • It is state level project funded from Central • assistance. • Being Republic Democracy , Key Associate • consists of • Representatives of People • Member of Loksabha/ Rajyasabha representing the SangolaTehisil. • Member of Legislative Assembly/ Council representing SanolaTehisil. • B) Executive Officers • 1. Executive Director • 2. Chief Engineer • 3. Superintending Engineer and • 4. Executive Engineer • C) Work awarded contractors • D) Farmers