An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Update and Planning for Next Steps Dushanbe May 20, 2013

  2. Kazakhstan Reserves : Oil 30 billion bbl Natural Gas 85 TCF Coal 31.3 billion tons Kyrgyz st an Hydro Power 20,000 M W Reserves : Oil 0.04 billion bbl Natural Gas 0.2 TCF Coal 0 .9 billion tons Hydro Power 26 , 0 00 M W Uzbekist an Reserves : Oil 594 m illion bbl Natural Gas 66 TCF Coal 3.3 billion tons Hydro Power 1 , 7 00 M W Turkmeni stan Taji kist an Reserves : Reserves : Oil 600 m illion bbl Oil 0.01 billion bbl Natural Gas 280 TCF Natural Gas 0.2 TCF Coal Modest Coal 3.6 billion tons Hydro Power Modest Hydro Power 40 , 0 00 M W Central Asia is endowed with vast energy potential…

  3. …whereas Afghanistan and Pakistan face severe electricity shortages and rapidly increasing demand Power network in Kabul, Afghanistan Kabulkarzaiblogspot photo

  4. The proposed CASA-1000 transmission facilities would: maximize the use of 1,300 MW renewable summer electricity surplus from existing plants in Central Asia(Kyrgyz Republic & Tajikistan) and provide electricity to consumers in electricity deficient South Asia (Afghanistan & Pakistan)

  5. Even without new power generation, Kyrgyz Republic and Tajikistan have sufficient electricity surplus during summers to warrant CASA-1000 Power domestic consumption and summer surplus (est. 2016 based on feasibility report) Tajikistan* Kyrgyz Republic *Tajikistan spills water from its dams without generating electricity during the summer

  6. The CASA-1000 project includes: • 500 kV line Datka-Khudjand (477 km), with Tajik network transferring Kyrgyz exports to Sangtuda. • Tajikistan Grid Strengthening. • 1300 MW AC-DC Convertor Station at Sangtuda. • 750 km HVDC line Sangtuda-Kabul-Peshawar. • 300 MW Convertor Station at Kabul (with both import & export capability). • 1300 MW DC-AC Convertor Station at Peshawar.

  7. CASA-1000 benefits all four countries: • Ensures a steady source of revenue from surplus hydropower exports for Tajikistan and Kyrgyz Republic, the weakest economies in Central Asia • Uses excess summer electricity that is currently being spilled • Alleviates electricity shortages in Pakistan during the peak summer season • Replaces fuel-based power generation in Afghanistan and Pakistan with clean hydropower • Establishes Afghanistan as a viable transit country, enhancing growth prospects • Requires no new power generation investments

  8. Project cost estimates per the feasibility study • US$1 billion investment in countries with constrained borrowing capacity • US State Department, AusAid, DFID, ADB, Islamic Development Bank, USAID, IFC and World Bank among the donors supporting pre-preparation activities

  9. Project Status • Preparation work is proceeding with Joint Working Group (JWG) through monthly VCs and face-to-face meetings. • IGC Secretariat strengthened –Executive Director (ED) appointed; USAID funding additional Advisor to the ED; Secretariat accounts audited. • Project commercial structure finalized– two options were reviewed (with and without setting up a separate project company.) The option of “Contractual JV” (without an SPV for CASA) is preferred by JWG; IGC resolution has been developed and endorsed by two countries (Afghanistan and Tajikistan). • Project commercial contract framework and Model PPA developed and is under review/discussion by the countries. • IFC Agreement to support procurement of constructor/operator signed by all. The Joint Working Group is working closely with the IFC to prepare bidding documents for procuring engineer/procure/construct/operate services for the project. • CASA-1000 included in the CAREC Energy Work Plan (2013-15). • Communications established online (www.casa-1000.org)

  10. The CASA IGC and JWG Intergovernment Council IGC Secretariat Afghanistan IGC member Kyrgyz IGC member Pakistan IGC member Tajikistan IGC member Joint Working Group Afghanistan WG Kyrgyz WG Pakistan WG Tajikistan WG

  11. Project Structure • Two Main Options for Project Structure • Option A: Contractual Joint Venture • Option B: Corporate Joint Venture • Countries preferred the Option A

  12. Project past milestones Aug’08 Sep ‘11 Dec ‘12 Feb ‘11 Nov ‘11 May ‘12

  13. Key challenges for Project preparation • Country capacity and commitment to work on commercial deal • Maintain continued commitment and build capacity (country advisors) to sustain the overall momentum of the Project. • One country’s slowness affects the entire process. • Support in bidding process (bidding advisors - IFC) • Perception from outside (links to Rogun/Kambarata, security in Afghanistan, etc.) • Financing gap – a critical issue • A key assumption for the preferred structure is that the project will be fully financed by IFIs (no private investments). • Two committed financiers (WB and IsDB); Gulf Coordination Group (aka “Arab Funds”) interested in financing via IsDB; the Russian offer remains on the table but its terms/conditions are not clear. • Donor’s conference and visits to capitals planned for 2013. • A narrow window – late 2013 – for approvals and much yet to do

  14. Commercial negotiations completed Proposed plan and actions • Bank Board Date • Finalize commercial framework End-May ‘13 Dec ‘13 Jan ‘13 Jan ‘13 Feb ‘13 Mar ‘13 Oct ‘13 May ‘13 • Filling the financing gap

  15. Project building blocks

  16. www.casa-1000.org