Project Planning. TECM 3200 Dr. Chris Lam. Phases in Project Planning. Determining project goals and objectives Outlining project deliverables Creating a project schedule Create a project plan. What do you need in your project plan?.

1 / 19

Télécharger la présentation

Project Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Planning TECM 3200 Dr. Chris Lam

  2. Phases in Project Planning Determining project goals and objectives Outlining project deliverables Creating a project schedule Create a project plan

  3. What do you need in your project plan? • Project plan is a document written for your team, but also to the client. Your project plan will be around 5-7pages • Cover Page • TOC • Team Description • List SMART Objectives • Team Roles and Structure– Graphical Representation would be appropriate • Project Background • Describe the website’s audience • Describe the website’s purpose • Project Schedule (includes Task, Start Date, End Date, Responsible parties, and resources needed)- This will be a spreadsheet or gannt chart created in EXCEL or Microsoft Projector WORD.

  4. Project Objectives • Each sub-team should first audit the site • Create a list of objectives based on the results of your evaluation • We already know that we’ll work on the site’s design, architecture, and content, but objectives should be more specific than just that. • E.g., What about the design needs fixing? Is it cluttered? Does it appear generic? • Let’s look at some examples

  5. Project Goals and Objectives • Create SMART goals • Specific • Measurable • Attainable • Realistic • Time-bound

  6. Specific • Identifies a specific action or event that will take place • Addresses 5 W’s (who, what, where, why, when) • Not Specific: Improve the website’s architecture. • Specific: Improve the site’s architecture by dividing the content into smaller chunks to better reflect the needs of the audience.

  7. Measurable • Include quantitative or qualitative measures • Answers whether you have successfully met a goal • Not Measurable: Test the usability of the site. • Measurable: Conduct usability test with at least 3 end users by April 4th.

  8. Achievable • Goals should be within the team’s control and influence • Is the goal achievable with available resources? • Is the goal achievable within the specified time frame? • Not Achievable: Test the website materials with 20 end users. • Achievable: Test the website functionality with 3 users recruited on campus by April 14th.

  9. Relevant • Goals should be instrumental to the overall objective of the project • Why is the goal important? • How will the help the team achieve it’s objective? • NotRelevant: Design a website and iOS app for the site. • Relevant: Design a website using responsive layouts that is accessible on multiple resolution devices.

  10. Time-Bound • Identify a definite target date for completion and/or frequencies for specific action steps • How often should a team member work on a specific assignment? • By what date should this goal be accomplished? • Not Time-Bound: Provide support and customer service for the end user. • Time-Bound: Provide support and customer service on-going for two weeks after the completion of the project.

  11. Outlining Project Deliverables • Create a Work Breakdown Structure (WBS) • WBS is a hierarchical representation of activities • Begins with major project areas • Breaks the project areas into actionable pieces of work

  12. Work Breakdown Structure • May want to create one for each sub-team and then combine them all into the final project plan • Begin by writing down all major deliverables • Break the deliverables down into a series of tasks • Break each task down into a series of sub-tasks

  13. Work Breakdown Structure Example • Deliverable: User Test Report • Develop user test • Select scenarios • Write facilitator script • Create data collection worksheet • Recruit three users • Determine target audience and identify potential users • Contact users • Schedule user tests • Conduct user test by November 27 • Write user report • Consolidate and digitize data • Analyze the data • Determine findings and recommendations and include them in the report

  14. 3. Project Schedule • Begin with list of deliverables, tasks, and sub-tasks • Work chronologically first: • Assigning a time estimation/deadline for each deliverable • Assigning a time estimation/deadline for each task within each deliverable • Assigning a time estimation/deadline for each sub-task

  15. Scheduling Example

  16. Project Schedule • Determine your resource needs • Labor • Time • Technology • Information

  17. Final Schedule Example

  18. How specific should you be? • Does the WBS contain enough detail to evaluate progress? • Do you have clear accountability for each deliverable, task, sub-task, and so on? • Are there start and end dates? • Can you easily estimate time and resources for each task? • Is the deliverable clearly defined?

  19. What do you need in your project plan? • Project plan is a document written for your team, but also to the client. Your project plan will be around 5-7pages • Cover Page • TOC • Team Description • List SMART Objectives • Team Roles and Structure– Graphical Representation would be appropriate • Project Background • Describe the website’s audience • Describe the website’s purpose • Project Schedule (includes Task, Start Date, End Date, Responsible parties, and resources needed)- This will be a spreadsheet or gannt chart created in EXCEL or Microsoft Projector WORD.