An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steve RueckertDirector of Standards Standards Update June 3, 2014 CUG Meeting/Salt Lake City, UT

  2. Overview • WECC Regional Reliability Standards • Recent FERC Approval • Current Projects • NERC Physical Security Standard

  3. Recent FERC ApprovalIRO-006-WECC-2 • FERC issued a Letter Order Approving IRO-006-WECC-2 on May 13, 2014 • Effective July 1, 2014 • No impact on BA or RC requirements • Updated to remove the reference to a specific WECC Unscheduled Flow Mitigation Plan and instead refer to the currently effective Plan regardless of which one it is

  4. Current WECC Regional Standards Activities WECC-0101 - Generator Validation Policy Conversion • Proposal to lower the applicable facility thresholds for generator testing and validation identified in recently approved NERC MOD standards • Proposal to modify the periodicity • Would become a Regional Variance to the NERC Standards • Would reflect current WECC Policy

  5. Current WECC Regional Standards Activities WECC-0105 – P81 Revisions • VAR-002-WECC-1 (AVR) • VAR-501-WECC-1 (PSS) • Proposing to delete R2 in both Standards and move it to the Measure for R1 • Ballot Pool Formation 5/28 – 6/19 • Ballot Window 6/25 – 7/18

  6. Current WECC Regional Standards Activities WECC-0106 – Energy Product Codes • INT-018-WECC-RBP-1 • No changes to the Definitions of the Codes • No changes to the requirement to use the Codes • Formatting • Moved actual definitions to the WECC Glossary • Ballot Pool Formation 5/28 – 6/19 • Ballot Window 6/25 – 7/18

  7. Current WECC Regional Standards Activities WECC-0107 – PSS Design and Performance • Originated from an RPIC assignment to review documents for appropriate categorization • WECC CWG identified several PSS documents that are related to reliability and should be considered for inclusion in regional reliability standards • The Drafting Team is still working on the first draft

  8. NERC Physical Security StandardApplicability • Transmission Owner (TO) • All 500 kV Facilities • Transmission Facilities Operating between 200 KV and 499 kV if: • Substation is connected at 200 kV or higher to three or more other substations • a substation has an aggregate weighted value exceeding 3000 where: • 200 kV – 299 kV = 700 • 300 kV – 499 kV = 1300

  9. NERC Physical Security StandardApplicability • Transmission Operator (TOP) if identified per Requirement R3 • Transmission Facilities at a single substation that are identified as critical to the derivation of Interconnection Reliability Operating Limits • Transmission Facilities identified as Critical to meeting Nuclear Plant Interface Requirements

  10. NERC Physical Security StandardRequirement R1 • Each TO shall perform an initial risk assessment and subsequent assessments to identify stations or substations that if rendered inoperable could result in widespread instability, uncontrolled separation or cascading • The initial risk assessment must be completed on or before the effective date of the standard

  11. NERC Physical Security StandardRequirement R2 • Each TO shall have an unaffiliated third party verify their risk assessment performed in R1 • Unaffiliated third party may be • PC, TP, RC • Entity with transmission planning or analysis experience • TO must modify its risk assessment findings or document the technical basis for not doing so • TO must implement procedures to protect sensitive or confidential information

  12. NERC Physical Security StandardRequirement R3 • Each TO shall notify the TOP of any primary control centers that operationally control a Transmission station or Transmission substation verified according to Requirement R2 and is not under the operational control of the Transmission Owner

  13. NERC Physical Security StandardRequirement R4 • Each TO or TOP notified by the TO per R3 shall conduct an evaluation of the potential threats and vulnerabilities of a physical attack to each of their respective stations or substations identified in R1 • Unique characteristics • Prior history • Intelligence or threat warnings

  14. NERC Physical Security StandardRequirement R5 • Each TO or TOP required to conduct an evaluation per R4 shall develop and implement a documented physical security plan for their identified stations or substations • Standard identifies attributes that the physical security plans must have • Left intentionally vague to allow for all situations

  15. NERC Physical Security StandardRequirement R6 • Each TO or TOP required develop and implement a documented physical security plan per R5 shall have an unaffiliated third party review the evaluation performed under R4 and the security plans developed under R5 • TO or TOP shall ensure the third party review is completed within 90 calendar days • TO or TOP must modify its evaluation or security plans or document the technical basis for not doing so

  16. NERC Physical Security StandardImpact on the Western Interconnection • 84 WECC TOs will have to conduct an assessment (Requirements R1 and R2) on approximately 687 substations • 338 500 kV • 81 345 kV • 268 230 kV • Unknown without the assessments how many substations, if rendered inoperable, will result in widespread instability, uncontrolled separation or cascading

  17. NERC Physical Security StandardWhere are we in the Process • NERC Board of Trustees Adopted the Standard on May 13 • NERC filed the Standard with FERC on May 23 • Reasonable expectation that FERC will act quickly

  18. Questions?