1 / 10

Steve Rueckert Director of Standards

Steve Rueckert Director of Standards. Standards Update – JGC Meeting September 5-6, 2013 Salt Lake City, Utah. NERC Standards Activities. Many ballots just closed Informal Outreach Five Projects just balloted Some industry comments expressed concern with the process.

theta
Télécharger la présentation

Steve Rueckert Director of Standards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steve RueckertDirector of Standards Standards Update – JGC Meeting September 5-6, 2013 Salt Lake City, Utah

  2. NERC Standards Activities • Many ballots just closed • Informal Outreach • Five Projects just balloted • Some industry comments expressed concern with the process

  3. NERC Standards ActivitiesRecent Ballots • BAL-001-2 – Real Power Balancing Control Performance (RBC) • 74.54% approval • EOP-010-1 – Geomagnetic Disturbance Mitigation • Failed (62.74%) • Second revision posted for comment 9/4 – 10/18 and ballot 10/9 – 10/18

  4. NERC Standards ActivitiesUpcoming Events • Many projects posted for comment and ballot over the next several months

  5. WECC Standards Activities • Items for Board Approval in September • PRC-(012 through 014)-WECC-CRT-2 Revisions to the RAS Review and Assessment Plan

  6. WECC Standards Activities • Upcoming Ballots • BAL-STD-002-0 Contingency Reserve variance/revision • TOP-007-WECC-1a System Operating Limits Interpretation • Retirement of INT-005-WECC-RBP-1 Real-time Interchange Schedule Manual Emergency Curtailment Procedures • Retirement of TPL-001-WECC-RBP-2 System Performance requirements WR1, WR2, WR4, and WR5

  7. WECC Standards Activities • Recent Filings at FERC • BAL-002-WECC-2 – Contingency Reserves • FERC Issued NOPR proposing to approve 7/18/2013 • Comments due 9/23/2013 • VAR-001-3 – WECC Variance to NERC Standard • FERC issued a delegated letter order approving on 6/20/2013 • Becomes effective 1/1/2014 • BAL-004-WECC-2 Automatic Time Error Correction • RD Docket on 8/27/2013 • Comments due 9/17/2013

  8. WECC Standards Activities • Upcoming Meetings • WSC – September 18 in association with the Board meeting • Revisions to the WECC voting page • Split up information into several pages • Newest on top, not oldest • Public view and user login view

  9. Additional Information • All current WECC project information is available on the WECC website. From the home page select Standards – www.wecc.biz • Drop down menu if you hover over Standards • NERC Standards Under Development http://www.nerc.com/pa/Stand/Pages/Standards-Under-Development.aspx • If you wish to receive announcements related to WECC Standards Development, send a note to distribution@wecc.biz asking to be added to the WECCSTDS distribution list

  10. Questions?

More Related