1 / 14

MESA IP Kick-Off Expression of Interest for Integrated Project

MESA IP Kick-Off Expression of Interest for Integrated Project. 31 st May 2002, Bois d’Arcy, France, EADS Telecom premises. MESA-IP : Agenda (1/2). 9.30 - 10.00 : Welcome Introduction and short round table 10.00 - 10-15 : MESA Project

Télécharger la présentation

MESA IP Kick-Off Expression of Interest for Integrated Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MESA IP Kick-OffExpression of Interest for Integrated Project 31st May 2002, Bois d’Arcy, France, EADS Telecom premises MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  2. MESA-IP : Agenda (1/2) • 9.30 - 10.00 : Welcome • Introduction and short round table • 10.00 - 10-15 : MESA Project • Presentation of MESA project of TIA and ETSI by Walter LEGRAND ( EADS Telecom ) • 10.15 - 12.30 : MESA as an Integrated Project : scope and partners • Presentation of the 1st draft • Scope definition by all partners - brainstorming • Partners involvement • 12.30 - 14.00 : Lunch MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  3. MESA-IP : Agenda (2/2) • 14.00 - 15.00 : MESA IP organisation • Project macro planning • Project organisation (Core Group, Sub-Project, Agreement, …) • 15.00 - 16.00 : Short term actions: EoI 7th June • Co-ordination EoI writing • Contributions • Project Acronyms • 16.00 - 17.00 : Conclusion MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  4. MESA-IP : 6FP context • Action line: IST - Communication and Network Technologies • Develop future generation of broadband wireless systems with high level of mobility • Approach • Studies • Simulation • Technology platform (tbd) MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  5. MESA IP : 6 Sub-projects (1/3) • Radio Access Network • signal processing / coding technique for UWB • spatial domain processing, smart antennas • Integrated space-time frequency • Ad hoc Network • Adaptative network protocol • Wireless network • Satellite network component MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  6. MESA-IP : 6 Sub-projects (2/3) • Radio Equipment • Adaptative radios: Software Defined Radio • Architecture Design for transceiver • Interoperability • Data transport level : protocols, gateway and satellite equipment • Application level : capability of supporting standard application MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  7. MESA-IP : 6 Sub-projects (3/3) • Security • End-to-end encryption • Project Management • Core group for project management • Training • Dissemination MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  8. EADS Telecom (Fr) Astrium (Fr) Motorola (Fr) Qualcomm Europe NATO ETSI CNES (Fr) European Federation of high tech SMEs HUT Helsinky University of Technology (Fi) University of Oulu (Fi) Universitat Politecnica de Catalunya (Sp) MESA-IP : Partners (1/3) MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  9. British Telecom (En) Telefonica (Sp) Samsung Electronics (En) Kathrein (Ge) Avanzit (Sp) TESLA (Cz) NEC Europe (Ge) CEFREIL (It) IDS Ingegnaria Dei Sistemi S.p.A (It) Supelec (Fr) VTT (Ge) Fraunhofer Institut (Ge) MESA-IP : Partners (2/3) Potential partners contacted but no answer received yet MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  10. Others potential partners to contact TAIT (Nz) EURECOM (Fr) Aachen University (Ge) Ulm University (Ge) UCLA (US) Stanford University (US) Ecole des Mines (Fr) ... MESA-IP : Partners (2/3) MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  11. MESA-IP : Organisation • Project macro-planning • Project organisation • Core Group • Sub-project • Agreement • ... MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  12. MESA-IP : Expression of Interest • EoI is made of • 1 form with project “market” summary of 10 lines • 5 pages of textual description of the project • 1st draft of textual description to be completed with • Need & relevance • Scale of ambition and critical mass • Integration • others ideas... MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  13. MESA-IP: Short term actions Dead-line for the EoI is next Friday 7th june 17.00 Submission by e-mail • Coordination EoI writing • Contributions of each partners MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

  14. MESA IP – Finding a smart acronym • BRAWNBRoadband Ad-hoc Wireless Network • PRAWNPRivate Ad-hoc Wireless Network • BB SPRAWNBroadBand Secured PRivate Ad-hoc Wireless Network • SAWNSecured Ad-hoc Wireless Network • BOWLINGBroadband ad-hOc WireLess In Next Generation MESA IP Kick-Off - 31st May 2002 -EADS TELECOM Premises

More Related