1 / 11

Opening Weekend

Opening Weekend . HUSKYTECH – UITS. Presenters: rick portuguez & Jonathan Moore. Brief history. Responsibilities Serve the technology needs of all UConn students both on and off campus – including regionals Assist students with networking and software problems

akina
Télécharger la présentation

Opening Weekend

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Opening Weekend HUSKYTECH – UITS

  2. Presenters: rick portuguez & Jonathan Moore

  3. Brief history Responsibilities • Serve the technology needs of all UConn students both on and off campus – including regionals • Assist students with networking and software problems • Help Students set up their digital life at the university Abstract • Huskytech – Student Tech services • Program offered through student affairs • Founded 20 years ago – ( previously resnet ) • Jonathan Moore – Manager • Currently 70 student workers

  4. Opening Weekend Support Interest in collaboration • SCOPE – 15,000 students moving in – All types of technology • 10 locations + Call Center • Fix Minor issues – setting up digital Life concept • Pivotal role for introduction to University life at Uconn Rewards of collaboration

  5. Successful Collaboration = Preparation • TeCH Support – equipment / transportation • Reslife – reservations / coordination • Information security office – network access / HUskyHUNt • Networking engineering – wired / wireless internet • Helpdesk - accounts • Unified communications – google apps • Server support group – skybox • Applications & tech Solutions – myuconn/ huskyct

  6. Preparation – 3 months for 3 days Training Equipment Marketing

  7. Implementation – 3 days for 3,000 students Setup Workflow Regroup • Communicate • Problems • Solutions • Supporting Staff • Flexibility • Locations • Marketing • Equipment • Training • Staffing • Intake • CSL Setup • Mobile Setup • Office Install • Device Setup • Accounts

  8. Reflection - • Problems that Arose • Windows 8 with trial Antivirus • Smart Televisions • Wireless printers • Trends • A lot of windows 8 • Operating system breakdown • Numbers -

More Related