SAVE DRAFT PLAN then SAVE Final Plan

SAVE DRAFT PLAN then SAVE Final Plan. SAVE DRAFT. the SAVE DRAFT PLAN Button on the PERFORMANCE PLAN tab will save your Work if you are interrupted. This feature allows saving A draft without notifying The Reviewer the Plan is ready for their Concurrence. Also it does

albina
Télécharger la présentation

SAVE DRAFT PLAN then SAVE Final Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAVE DRAFT PLAN then SAVE Final Plan

  2. SAVE DRAFT the SAVE DRAFT PLAN Button on the PERFORMANCE PLAN tab will save your Work if you are interrupted. This feature allows saving A draft without notifying The Reviewer the Plan is ready for their Concurrence. Also it does Not check reports to Information. If you get a Reports To error on SAVE, Use this button to save your Work.

  3. SAVE DRAFT the SAVE DRAFT PLAN Button does not allow Printing the Draft Plan at This time. Clicking SAVE DRAFT PLAN checks the Created Plan Box and adds the Date. Clicking SAVE DRAFT grays out the Finalized Plan button and Does not allow for save of Final version.

  4. To SAVE final plan After clicking SAVE DRAFT PLAN • Sign Out and sign back in • Go to Manager Self Service > Tasks > Performance > Performance Plan > Existing Plan. • Click the Finalized Plan box inside the Supervisor’s box at the bottom of the Performance Plan tab. • Click SAVE

  5. SAVE final version After SAVE DRAFT PLAN SAVE button is on both tabs. Click SAVE only once! SAVE notifies the Reviewer Via email the plan is ready for concurrence. Clicking SAVE checks the FINALIZED PLAN button and The CREATED PLAN button If not previously checked. And Adds the date SAVE checks the accuracy Of reports to data.

  6. SAVE final version after SAVE DRAFT PLAN SAVE also formats the AD-435 for printing. You must click the SAVE Button before attempting to print. Do not try to print the AD-435 form until after Clicking the SAVE button. It Will not be formatted correctly To PRINT: Click Create Printable Form Button to print the AD-435