An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NER BUILDING ENERGY AUDITDME Presentation02 October 2002 Mohato Mokhobo

  2. Outline Of The Presentation • Background • Key stakeholders • NER energy audit • Recommendations • Implementation plan • Implementation Funding (Bonesa)

  3. Background • This project is the outcome of the dialogue between DME and DANCED (1999 to 2001) which aims at building capacity within South Africa towards Energy Efficiency (EE) and Renewable Energy (RE). • It also aims at making DME/NER “case study ” that will lead to the implementation of EE to all government buildings in SA.

  4. Key Stakeholders (NER) • DANCED • DME • NER • COWI • CEF

  5. NER Energy Audit • The audit concentrated more on lighting due to the fact that the Heating, Cooling and Air Conditioning (HVAC) system was in a poor operating condition.

  6. Recommendations • Lighting: • It is recommended that case 3 be implemented due to the fact that this is the option that renders maximum savings. • HVAC: • The building holds the potential to be one of the most energy efficient buildings if attention is given to upgrading and maintaining the HVAC and the control systems (development of a maintenance policy).

  7. Implementation Plan • A parallel phased in approach (lighting and HVAC) will be the best option given the circumstance and condition of the HVAC system. • With lighting, a dry-run test will be performed before the actual implementation of the project.

  8. Funding For Implementation (Lighting) • Talks are underway between Bonesa and NER to secure funds for the implementation of this project. • Bonesa has agreed in principle to fund the project and a proposal will be drafted by October 2002.

  9. THANK YOU!!