An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011Orlando, FL

  2. 2011 USACE/FEMA RAP Workshop Temporary Emergency Power Mission

  3. Temporary Power Mission Capabilities and Improvements • USACE Resources: 7 PRT’s, DTOS’s, 249th Engineer Battalion, 3 ACI Contracts, World Wide Power Contract • FEMA: ~800 generators at 4 CONUS DC’s and 3 OCONUS DC’s. • Pre-Scripted Mission Assignments developed for 4 different “Configuration Packages” for resources based on mission requirements. • New tools and technology: EPFAT, Temp Power Mission Common Operating Picture (GIS modeling and mission tracking), SAVER (GIS generator tracking/data-bank).

  4. Temporary Emergency Power • Issue Title: Power Mission Support Site Planning • Problem Statement: • Lack of understanding and/or preparedness of the requirements for ISBs and staging areas for temporary emergency power. • Key Discussion Points: • Regions may not be aware of temp power requirements • Need to have ISB/Staging area COP from both region and state and USACE • Action #1: Integrate and identify gaps to current ISB and Staging area locations to interagency COP. • Start Date: Jan 2012 • Est. Completion Date: June 2012 • Action Lead: FEMA • USACE • Action #2: Develop list of USACE facilities for potential use as forward staging areas. • Start Date: Jan 2012 • Est. Completion Date: June 2012 • Action Lead: USACE • Ongoing Resolutions: • Some regions already have ISB locations in SAVER • Hurricane/New Madrid planning • Obstacles: • -Firewall and data sharing protocols • PDT Members (Action #2): • FEMA R5 • USACE • USACE national OMBIL coordinator

  5. Temporary Emergency Power • Issue Title: Doctrine for Multi-jurisdictional ISB’s • Problem Statement: • Current temporary power doctrine lacks the capability to direct or instruct multi-region and multi-jurisdiction events. • Key Discussion Points: • FOS EM declaration and Major declaration PSMAs needed • Discussion on how we will handle multi- jurisdiction Con ops development • Hard part is what color money • Not having enough AO’s for multi state events • Resource allocation and adjudication • Ongoing Resolutions: • - Used algorithm developed by Pittsburgh District • Obstacles: • 1. Lacks institutional knowledge • 2. PRT Staffing limitations • PDT Members: • Jason Wind (FEMA) • Mark Gallagher (FEMA) • Tim Barnett (FEMA) • Tom Murray (FEMA) • Lauren Mclane (FEMA) • Action #1: Assemble PDT and draft doctrine • Start Date: Jan 2012 • Est. Completion Date: June 2012 • Action Co-Lead: Pete Navesky, T.J. Fichera

  6. Temporary Emergency Power • Issue Title: Tools and Technology • Problem Statement: Final integration of interagency technology • Key Discussion Points: • Great progress on: EPFAT, SAVER, LPRAT, USACE COP • Action #1: Finalize the changes with the technology integration • Start Date: April 2011 • Est. Completion Date: June 2012 • Action Co-Lead: Darrell Ransom (FEMA) Dave Bishop (USACE) • Action #2: Develop action plan to provide: outreach, demonstration and presentation to embrace concept by community • Start Date: Jan 2012 • Est. Completion Date: Jan 2013 • Action Lead: Darrell Ransom (FEMA) Dave Bishop (USACE) • Ongoing Resolutions: • - Completion of program development • - Continuation of PDT • Obstacles: • - Firewall and data sharing protocols - USACE visibility of FEMA generator transponders • PDT Members: • Darrell Ransom (FEMA) • Dave Bishop (USACE) • Dana Thorpe (FEMA) • Frank Vargas (FEMA) • Frank Appelfeller (USACE)

  7. Temporary Emergency Power • Issue Title: Customize and tailor temporary power response packages to meet mission requirements • Problem Statement: USACE and FEMA have been increasingly successful at customizing Temporary Emergency Power response packages based on the anticipated requirements and/or the available funding • Key Discussion Points: • Better interagency coordination and early planning • Use tools and technology • Action #1: Develop draft concept of operations to customize the temporary power mission resources to the event. • Start Date: Jan 2012 • Est. Completion Date: Long Term • Action Lead: Dave Bishop (USACE) • Action #2: Develop early pre-event planning for emergency power resources. • Start Date: Jan 2012 • Est. Completion Date: Long Term • Action Lead: Dave Bishop (USACE) • Ongoing Resolutions: • Use of EPFAT • Employment of the 249th • Power Interagency Task Force development • Obstacles: • -Integration between EPFAT and ENGLink • -Understanding state capabilities • PDT Members: • Kerri Stark (USACE) • Dana Thorpe (FEMA) • Jamie Clark (DOE) • T.J. Fichera(USACE) • Kent Weathers (FEMA)