1 / 11

PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS

PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS. R. Garoby for R. W. Assmann, A. Ballarino, L. Bottura, G. De Rijk, M. Meddahi, V. Palladino, W. Scandale, L. Walckiers, F. Zimmermann. OUTLINE PURPOSE & CONTEXT CONTENT PARTNERS RESOURCES & SUMMARY. Purpose & Context. Purpose:

alyson
Télécharger la présentation

PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS R. Garoby for R. W. Assmann, A. Ballarino, L. Bottura, G. De Rijk, M. Meddahi, V. Palladino, W. Scandale, L. Walckiers, F. Zimmermann • OUTLINE • PURPOSE & CONTEXT • CONTENT • PARTNERS • RESOURCES & SUMMARY

  2. Purpose & Context Purpose: • To foster joint European efforts in the preparation for the upgrade of major European accelerator facilities: • CERN: LHC luminosity upgrades + upgrade of n facility • GSI: FAIR project • [ISIS (RAL) upgrades ? PSI upgrades ?] • … and in the interest of future European projects (Future European n facility? EURISOL? ESS? …) Context: • Based on the proposals submitted to ESGARD in 2006 and assembled in a 45 MEuros IA presented at CARE06 (Frascati – Nov. 2006) • Taking into account: • the approval by Brussels of the CNI for SLHC and of the DS for neutrinos, • the progress in the definition of the most promising options for LHC, • the instructions of the laboratory directors (ESGARD meeting on 23/07/2007): • Total budget: 15 MEuros (core) + 8 MEuros (options) • 4 years duration • But without yet counting indirect costs… Initial requests: 58.5 MEuros !

  3. Content (1/4): Networks • LHC luminosity upgrade • GSI (FAIR) • Upgrade of CERN n facility • Future European n facility

  4. Content (2/4): Superconducting magnets • LHC luminosity upgrade • n facility • LHC luminosity upgrade • industry • LHC luminosity upgrade • GSI (FAIR) • ITER

  5. Content (3/4): Collimators & Targets • LHC luminosity upgrade • GSI (FAIR) • n facility • industry • LHC luminosity upgrade • n facility

  6. Content (4/4): High Energy Pulsed Proton Linac • LHC luminosity upgrade • n facility • EURISOL… • ESS ?

  7. Partners (20/34)

  8. Partners (34/34)

  9. IndustrialPartners (6) !

  10. PartnersoutsideEurope (8)

  11. Resources & Summary

More Related