1 / 10

CPV DCS Status

Mikhail Bogolyubsky, Serguei Sadovsky CERN, DCS workshop, 9 October, 2006. CPV DCS Status. PHOS-CPV. 1. 1. 3. 30. 32. 1. 20. 27/10/05. [UI node]. Database(s). 1. PVSS II. PVSS II. PVSS II. Control room (ACR). OPC client. DIM client. User interface. Ethernet. Ethernet. CR3.

amalia
Télécharger la présentation

CPV DCS Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mikhail Bogolyubsky, Serguei Sadovsky CERN, DCS workshop, 9 October, 2006 CPV DCS Status

  2. PHOS-CPV 1 1 3 30 32 1 20 27/10/05 [UI node] Database(s) 1 PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet Ethernet CR3 CR3 CR3 CR3 2 2 2 PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client DIP CAEN OPCserver Wiener OPCserver ELMB OPCserver E E E PCI-CAN [GWG] C GasPVSS SG2 CR4-Y10 PLC SY2527 (2*A18833P) ACC SG2 Gas UX-C16 Wiener ELMB CR5 Gas HV LV Detector Detector Detector (Ni100 sensors) Detector High Voltage Low Voltage Temp. Monitor Gas system

  3. FSM of the CPV Detector

  4. CPV State Diagram

  5. CPV LV/HV state diagram

  6. CPV LV/HV channel state diagram

  7. FEE CPV state diagram

  8. CPV DCS status Wiener Low Voltage Power Supply -- standard solution CAEN High Voltage Power Supply -- standard solution ELMB -- standard solution CPV FEE -- the same as in HMPID Sub-Systems Interlocks -- not started yet

  9. LED-Monitor system state diagram

More Related