1 / 27

Design of Transfer Line-2 (TL-2) for CLIC Test Facility – 3 (CTF-3)

Design of Transfer Line-2 (TL-2) for CLIC Test Facility – 3 (CTF-3). Amalendu Sharma, A.Rahim, A.D.Ghodke and Gurnam Singh. IOAPDD Raja Ramanna Centre for Advanced Technology Indore – 452 013 India. CTF-3 collaboration meeting, January 2007, CERN. Indian participation.

anacampbell
Télécharger la présentation

Design of Transfer Line-2 (TL-2) for CLIC Test Facility – 3 (CTF-3)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design of Transfer Line-2 (TL-2) for CLIC Test Facility – 3 (CTF-3) Amalendu Sharma, A.Rahim, A.D.Ghodke and Gurnam Singh IOAPDD Raja Ramanna Centre for Advanced Technology Indore – 452 013 India CTF-3 collaboration meeting, January 2007, CERN.

  2. Indian participation CTF-3 and Indian participation Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  3. Progress so far Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  4. Main requirements of design • R56 from -0.35m to +0.35m. • T566 = 0 in entire range of tuning. •  = 4-5m and  = 0 at exit in both planes. • Emittance dilution < 10%. • 4m dispersion free region for the tail clippers (collimators). • Available magnets to be used. • Line implementation in the existing building. Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  5. Beam parameters Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  6. Magnets available Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  7. 4m Length of final matching doublet 20.75 Minimum distance from the edge of element to wall > 50mm M 6.37m 17 3.2m 1.21m Geometrical constraints Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  8. Module-3 Tunable R56 achromatic arc, Final matching doublet Module-2 Straight section for collimator. vertical achromat, matching section for Module-3 Module-1 From extraction point of CR to first bend magnet. An achromat Beam direction. Design approach The design studies are carried out using MAD-8 program. Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  9. A Beam direction Design details: Module-1 Module-1 is an achromat with opposite bends from extraction septa of CR to first bend. • Very low flexibility in achromat. • Quadrupoles close to its highest strength. • High  at exit of module-1 => Rapid rise in . Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  10. Space for tail clipper Beam direction Vertical Achromat Design details: Module-2 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  11. Design details: Module-3 The linear matrix element for controlling the bunch length Change in Path Length Momentum deviation = p/p Second order relation between path length and momentum deviation Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  12. Design details: Module-3 Bunch length manipulation (linear) Energy-time correlation with RF-field Where chirp Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  13. Design details: Module-3 Bunch length manipulation (including second order terms) Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  14. Mirror plane of R56 arc Beam Direction Layout of Module-3 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  15. Approach Find out dispersion and its derivative for required R56 and to form an achromat. Find a solution, such that 1. High  @ sextupoles to control T566. 2. Decoupled s @ sextupole locations. 3. I – transformer between sextupoles. Required Twiss parameters at Matching point Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  16. Twiss parameters and Dispersion R56 = -0.35 (MAD sign convention) Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  17. Twiss parameters and Dispersion Continued… R56 = 0.00 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  18. Twiss parameters and Dispersion Continued… R56 = +0.35 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  19. Vertical dispersion Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  20. T566 correction and phase space distortion T566 Correction with sextupoles Phase space distortion R56 = -0.35m X-Plane Y-Plane R56 = 0.00 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  21. Available Magnets and Power Supplies Needed Dipole magnets Quadrupole magnets Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  22. Available Magnets and Power Supplies Needed… Sextupole magnets Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  23. A Better Alternative For lowering -functions in module-2, one more quadrupole is added in the module-1. Preliminary results are… R56 = +0.35 R56 = 0.00 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  24. R56 = -0.35 Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  25. Complete layout of line with building Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  26. Summary • Optics design in linear zone done for the R56 from -0.35m to +0.35m. • T566 correction studies in progress and preliminary results of R56 = 0.00 and -0.35 obtained. • -functions higher in module-2 beginning and can be lowered with one more quadrupole in Module-1. Acknowledgements We are thankful to Dr. Hans Braun, Dr. Frank Tecker for the valuable review and feedback during this work. Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

  27. Thanks Design of TL-2 for CTF-3, RRCAT, India. CTF-3 collaboration meeting, January 2007, CERN.

More Related