An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. GERENCIA ESTRATGICA DE COSTOS UN ENFOQUE MODERNO

    2. GESTIN DE COSTOS

    5. PROPUESTA COSTEO BASADO EN ACTIVIDADES: ABC (Activity Based Costing). ADMINISTRACIN BASADA EN ACTIVIDADES: ABM (Activity Based Management) .

    8. Por qu actividades? Si fabricar un producto o prestar un servicio es costoso, es porque las actividades que se desarrollan son costosas; y son costosas porque no se usa la tecnologa precisa, porque el recurso humano no tiene el perfil que se requiere, o porque consume muchos recursos. Si se quiere reducir el costo es necesario intervenir las actividades.

    13. FASES PARA LA CONSTRUCCIN DEL MODELO ABC Conocimiento general de la Universidad. Sensibilizacin y capacitacin del personal. Determinacin de los objetos de costo. Anlisis de los sistemas de informacin. Determinacin de los procesos, subprocesos y actividades. Determinacin de los recursos.

    14. Construccin del modelo de costos. Determinacin de direccionadores a todo nivel. Implantacin del sistema computarizado. Clculo de los costos unitarios de los objetos de costos. Anlisis de costos y rentabilidad. FASES PARA LA CONSTRUCCIN DEL MODELO ABC

    15. POR QU LOS COSTOS?