210 likes | 321 Vues
This project, prepared by En’am Sab, Elaish Nour, Kananh, and Majdolin Yasen, examines various excavation support systems used in Palestine, including retaining walls, big boulder foundations, soil nailing, soldier piles, and sheet piles. The study focuses on a case involving a 7.5 m deep excavation with specific soil properties and design parameters. The analysis covers critical factors such as moment, shear capacities, overturning checks, and sliding stability, leading to conclusions on effective excavation methodologies and recommended practices for optimal protection measures.
E N D
Prepared by : En’am Sab’ Elaish NourKananh MajdolinYasen Submitted to: Sami Al-Hijawe Project 2
1- Retaining walls: 2- Big Boulder Foundations 3- Soil Nailing 4- Solider Pile 5- Sheet piles 6- Freezing Type of excavation support system ( In general)
1- Big Boulder 2-Row of Pile 3- Retaining Wall The most commonly used methods in Palestine are:
Excavation Parameter Depth=7.5 m Assumed : Surcharge load= 10 KN/m2 Water depth =20m Water density=9.81 KN/m2 Min. fluid density=5 KN/m2
ɣ=19 ɣ'=9 ɸ=30 = ɸ =20 Ka=0.28 Kp=5.74 Soil properties
Shape of pile Length=13 Penetration depth=5.5m Excavation = 7.5
Deflection = 6 cm OK Deflection
Moment Moment =751 KN/m2 Moment capacity =901.5/.8=1127 ok
Shear =179.9 KN/m Shear capacity =305.6/0.8=382 KN/m ok shear
qall=400kN/m^2 Ka=0.2 Kp=5 ф=40° C=0 ɣ=19 KN/m3 =(2/3)*ɸ=26.7 q1=ɣ*h*k=21*7.51*0.2=31.542KN/m2 q2=kw=0.2*10=2 KN/m2 p1=0.5*q1*h=0.5*31.542*7.51=118.44KN p2=q2*w=2*7.51=15.02KN p1+p2=133.46KN Moverturning=p1(h/3)+p2(h/2)=296.5+7.51=304.01KN Check overturning
W=∑Wn=493KNMn=1665KN.M∑=mresistingF.S=mresisting/moverturning1665/304.01=5.5>2….W=∑Wn=493KNMn=1665KN.M∑=mresistingF.S=mresisting/moverturning1665/304.01=5.5>2….
Presisting/Psliding>or=1.5 psliding=133.46 kN Presisting=(∑w*friction factor)+(ɣ*h*kp ) =(493*0.5)+(21*1.8*5)=602.5KN Check sliding • = 4.5>1.5 Ok
M = P*e=293.21kN.m Chick bearing pressure KN/m^2 q1 <qallok KN/m^2 q2 <qallok
1- The two alternatives of protection are goal for the required purpose . 2- The using of piles requires less time Of the excavation 3- The distance between the adjacent piles in the row is recommended to be less than 3*D 4- Piles are recommended to connect on the top y means of a reinforced concrete beam. the following conclusions can be made :