1 / 13

TFMA 2007 Freeboard Survey

TFMA 2007 Freeboard Survey. Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the 2004 Survey and TFMA members that participated. “Work in Progress”. John Ivey, PE, CFM – Halff Associates Lochen Wood, CFM – LCRA Roy Sedwick, CFM – TFMA/LCRA. Questionnaire.

anthea
Télécharger la présentation

TFMA 2007 Freeboard Survey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TFMA 2007 Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the 2004 Survey and TFMA members that participated

  2. “Work in Progress” • John Ivey, PE, CFM – Halff Associates • Lochen Wood, CFM – LCRA • Roy Sedwick, CFM – TFMA/LCRA

  3. Questionnaire • Zone AE/VE - New construction must be elevated ___ feet above BFE as shown on FIRM. • Zone AE/VE - New construction must be elevated ___ feet above BFE determined by a study based on fully developed watershed (future conditions)

  4. Master Drainage Plan (MDP) developed for areas in and around the community using fully developed conditions, for areas the FIRM doesn't address. • Are Developers required to use the MDP BFE. • Zone A (un-numbered) - Developer must conduct a study to define the BFE. If development is greater than 50 lots or 5 Acres, whichever is the lesser. [60.3(b)(3)] Zone A (un-numbered)

  5. Developer must conduct a study to define the floodway boundary based on existing conditions. • Zone A (un-numbered) - Developer must conduct a study to define the floodway boundary based on fully developed watershed (future conditions)

  6. Floodway - no development allowed within ___ feet from the floodway boundary. • No fill is allowed in the floodway or floodplain without mitigation (No adverse impact).

  7. Coastal (Zone VE) Requirements • V/VE Zone - New construction within Zone AE that is within ___ feet of the VE Zone boundary must be constructed to V Zone requirements. (Setback) • V/VE Zone requirements to elevate __ feet above the BFE

  8. Requirements in Zones B, C & X • Zone X (Shaded) - New construction must be elevated ___ feet above natural grade or above the crown of the nearest street. • Zone X (Unshaded) - New construction must be elevated ___ feet above natural grade or the crown of the nearest street. • (Note – Friendswood requires +24” in X shaded and +18” in X unshaded)

  9. Elevation Certificates • Elevation Certificate Requirements - • (1) Submitted with initial permit application. Y/N • (2) Submitted prior to forming/pouring lowest floor. Y/N • (3) Submitted when structure is completed. Y/N • (4) Required prior to issuing a CO. Y/N

  10. Community Rating System • Is your community enrolled in CRS? Yes/No • Current CRS Rating ___ • CRS Goal: ___ • How many CFM’s does your community have on staff? ___

  11. Other Requirements • Detention (on site and/or regional) • Setbacks from FP and/or FW boundaries • CLOMR required before permit issued • No development in floodway • No development in floodplain • No Adverse Impact • Additional Wetland/wildlife requirements • Floodplain must be open space • Drainage easements must be dedicated to City • Other….

  12. 2006 Survey Results

  13. Thank you for participating! Contact John Ivey at jivey@halff.com for copies

More Related