1 / 10

n _TOF detector status

n _TOF detector status. n_TOF CERN team meeting, january 16 th , 2013. Outline (list of detectors). PPAC (fission) FIC (fission) Diamond ( n,lcp ) Future detectors (capture, beam imaging, ( n,lcp ), ( n,xn ), …). SiMon (flux monitoring) C6D6 (capture) TAC (capture) µMGAS ( varii ).

asis
Télécharger la présentation

n _TOF detector status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. n_TOF detector status n_TOF CERN team meeting, january 16th, 2013

  2. Outline (list of detectors) • PPAC (fission) • FIC (fission) • Diamond (n,lcp) • Future detectors (capture, beam imaging, (n,lcp), (n,xn), …) • SiMon (flux monitoring) • C6D6 (capture) • TAC (capture) • µMGAS (varii)

  3. SiMon (flux monitoring) • 4 Silicon detectors: (under INFN responsibility) • At least 2 detectors heave a high leakage current after 9 years of operations • Preamp work well but shielding should be improved

  4. C6D6 (capture) • Bicron (2 @CERN + 2 in Saclay) • Detector filling? • Response to γ-flash (seems OK but count loss above few hundreds keV)? • FZK (x2) • One detector broken (PM) -> Only one detector can still be used • Legnaro (x4) 2 more would be good • Need to make a mechanical support for these detectors • 1 detector at GELINA for testing • CERN allowance? (BC-537 replacement by BC-436 or BC-509)?

  5. TAC (capture) • 40 crystals (12 pentagons, 28 hexagons ) + 2 spares ( 1 P, 1 H) • Spare PM? • Optical coupling should be checked (i.e. detector dismounting and remounting) contact person; R. Reifarth • Voltage divider should be improved (noise and 600 ns rebound): A. Masi • Ball closing (alignment of each detector, 2 hemisphere support matching)?

  6. µMGAS (varii) • New 2D seems to work nicely. Better electronic reading should be investigated (Saclay action) • 6 small (3 cm diam.)are no longer used (monitoring in 2009 and fission tagging in 2010) • 16 big (10 cm diam.) detector dimensions (mainly 50 µm mesh thickness) • 25 µm mesh thickness do not work properly (too high capacitance or too short amplification distance) • Detector behavior after 2 years in front of Pu240 samples? • 1 chamber and 6 detectors at Sevilla • 12 FTMG • 1 proto without copper inside (in construction) • 3 preamp modules (16 channels each) • Some channels should be repaired (suffer from some spark) • Well suited for fission, but gain should be adjusted for lcp detection • Better preamp shielding should be investigated

  7. PPAC (fission) • Managed by IPN Orsay/ USC collaboration

  8. FIC (fission) • 3 chambers used in the past • 1 chamber contaminated (was it send to final disposal or still at CERN?) • Chambers store in the “grillage” • No idea about detectors and associated electronics

  9. Diamond (n,lcp) • Christina’s and Erich’s business

  10. Future detectors • See discussion to come

More Related