An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation

  2. California Environment

  3. Southern California Mega Region 22 Million 60 Percent

  4. Northern California Mega Region 10 Million 25%

  5. Central Valley 4 Million 10 Percent

  6. California Transportation FundingAll Modes

  7. Governor Schwarzenegger Announces the Strategic Growth Plan • January 2006 – Governor proposes the California Strategic Growth Plan (SGP) • $222 billion total infrastructure fix over ten years • $107 billion dedicated to transportation • Reduce congestion • Improve connectivity • Improve safety • Reduce air pollution

  8. Strategic Growth Plan

  9. California Voters Support Infrastructure Improvements • November 2006 – California voters approve a $37 billion infrastructure package • Dedicate fuel sales tax to transportation (Prop 1A) • $19.9 billion transportation (Prop 1B)

  10. Proposition 1BHighway Safety, Traffic Reduction, Air Quality, andPort Security Fund of 2006 • State highway safety improvements and repairs • Freeway upgrades to reduce congestion • Local street and road repair • Seismic safety improvements to local bridges • Expansion of public transit • Air pollution reduction • Port anti-terrorism security improvements

  11. Mobility Improvement on Highly Congested Travel Corridors • $8.5 Billion • Congestion in California is projected to increase 35% over the next decade • These dollars target performance improvements on highly congested travel corridors • Interregional connectivity between developing rural areas and urban centers • Safety improvements

  12. Ports Infrastructure, Securityand Air Quality • $3.1 Billion • $ 2.0 Billion for Trade Corridors Improvement Fund • Improve goods movement at California’s sea, land, and air ports, as well as major truck corridors • $ 1.0 Billion to Reduce emissions and improve air quality in and around ports • $ 100 Million for port, harbor, and ferry terminal security

  13. Public Transportation Modernization, Safety and Security • $4.0 Billion • Rehabilitation, safety or modernization, capital service enhancement or expansion, new capital projects, bus rapid transit improvements, rolling stock procurement, rehabilitation, or replacement • $1.0 Billion • Capital projects that provide increased protection against a security and safety threat

  14. Local Street and Roads, Congestion Relief, and Traffic Safety • $2.0 Billion • $1.0Billion to Counties • $1.0 Billion to Cities • Likely source for local road rehabilitation projects • Minimum $400K to each city

  15. State Highway Operations and Protection Program • $750 Million • $400 Million pavement rehabilitation • $100 Million for operational elements such as detection and metering • $250 Million for traffic light synchronization and other technology to improve safety, operations, or capacity of local streets and roads

  16. Seismic, School Bus Retrofit, and Highway-Railroad Crossing • $125 million • Provide an 11.5% required match to retrofit 497 remaining local bridges • $200 million • School bus retrofit to reduce air pollution and exposure to diesel exhaust • $250 million • Completion of high-priority grade separations and railroad crossing safety improvements

  17. Proposition 1B Accountability • The Bond Act or Proposition 1B contained specific accountability requirements that became the basis for developing accountability plans for some elements of the Bond program. Other elements referred to existing laws, regulations, or processes. • The Governor issues an Executive Order to ensure that the bond proceeds are spent efficiently, effectively, and in the best interest of the people of California

  18. Self Help Counties • 19 Counties • ½ Cent Sales Tax • Voter Approved • Locally Allocated • $3 billion Annually

  19. New Initiatives • Urban Partnership Agreements • San Francisco ($564 million) • Los Angeles ($213 million) • Expand upon existing HOT and Congestion Pricing programs • San Diego • Orange County

  20. Authorization • Ensure the financial integrity of the Highway and Transit Trust Funds. • Rebuild and maintain transportation infrastructure in a good state of repair. • Establish goods movement, as a national economic priority. • Enhance mobility through congestion relief within and between metropolitan areas. • Strengthen the federal commitment to safety and security, particularly with respect to rural roads and access. • Strengthen environmental stewardship. • Streamline Project Delivery.

  21. Thank YouCalifornia Department of Transportation