Optimized design of control plans based on risk exposure and resources capabilities

Belgacem BETTAYEB PhD Candidate P. Vialletelle*, M. Tollenaere, S. Bassetto G-SCOP Laboratory - Grenoble Institute Of Technology, France * ST microelectronics Crolles, France ISSM PC-O-91 Belgacem.bettayeb@grenoble-inp.fr.

ata
Télécharger la présentation

Optimized design of control plans based on risk exposure and resources capabilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Belgacem BETTAYEB PhD Candidate P. Vialletelle*, M. Tollenaere, S. Bassetto G-SCOP Laboratory - Grenoble Institute Of Technology, France * ST microelectronics Crolles, France ISSM PC-O-91 Belgacem.bettayeb@grenoble-inp.fr Optimized design of control plans based on risk exposure and resources capabilities ISSM 2010

  2. Problem statement • Quality control and production control policies are usually designed separately • Tools and processes may remain uncontrolled over a long production period  grow up of the uncertainty about products quality • Releasing uncertainty too late may lead to manage a major scrap (thousands of defective products) • An effective monitoring of uncertainty logically leads to the limitation of risk exposure in terms of products loss

  3. A 2-stage Control plan design Stage 1 Risk-based allocation Control plan SRimin = nimin / MixProdF(i) nimax = niminniC SRimax = nimax / MixProdF(i) tikmin tikmax • Availability constraints • Target cycle time constraints nimin ; tikmin ; tikmax Actual capacity of control CHRBCP Oper. Criterion Partition Stage 2 Capacity optimization Effective capacity for controls TOTALCAPA 1 C1 n1C RCAPA i niC Ci nCNOP NOP CNOP i  : operation index k  : control index NOP  : number of controlled operations Ci : partition criterion of operation i niC: complementary number of controls nimin  : minimum number of control for operation i tikmin : release date of the kth control of operation i tikmax : due date of the kth control of operation i MixPrdF(i) : planned quantity of the product F(i) F(i) : product index of operation i

  4. R0(t) Rn,T(t) R0max RL Rn,T(tk) a T H t1 t2 … tk-1 tk …tn Stage1: Risk based allocation (1/2) Let’s assume • Constant increasing risk • Risk is reset by each control • RL: the limit of risk exposure over which a loss is inadmissible • R0(t): risk evolution without any control plan • Rn,T(t): risk evolution with control plan (n,T) • AVn,T: the added value of control plan (n,T) Rn,T(tk)=a(tk-tk-1) AVn,T=R0max - max Rn,T(t) Objective: remaining below RL

  5. Stage1: Risk based allocation (2/2) Optimal control plan should be T* = (t1*,t2*,…,tn*) = argT max AVn,T n* = min n \  T* \ AVn*,T*≥ R0max - RL Solution using precedent assumptions t1* = t2*-t1* =…= tk*-tk-1* =…= H-tn=H/(n+1) n*= ⌈aH/RL - 1⌉  nimin=⌈aHi /RL - 1⌉  i{1,…,NOP}

  6. CHRBCP TOTALCAPA TOTALCAPA RCAPA Stage2: Adjustment of initial ctrl plan (1/2) • Case 1. CHRBCP < TOTALCAPA • RCAPA = TOTALCAPA - CHRBCP is distributed among operations according to a repartition criterion Ci i{1,…,NOP} • niC : number of complementary controls to add for each operation i according to Ci • ni = nimin + niC • examples of criterion: Ci= CPMi/CPi ; Ci=(CPMi /CPi.).(Pti/Mti)

  7. CHRBCP TOTALCAPA OCHAR Stage2: Adjustment of initial ctrl plan (2/2) • Case 2. CHRBCP > TOTALCAPA • OCHAR = CHRBCP – TOTALCAPAis cancelled by removing some controls on the different operations according to a criterion Ci’=1/ Ci • ni = nimin - niC

  8. Numerical Experiments (1/3) • Experimented instance • 3 products : A, B and C • 3 process tools : CMP, CVD and FUR • 1 measurement tool: SATH • Effect of Exposure Limit RL SR=f(RL) ; OBJSAT=75%

  9. Numerical Experiments (2/3) • Effect of Measurement capacity SR=f(OBJSAT) RL

  10. Numerical Experiments (3/3) • Effect of Measurement capacity and RL SR=f(OBJSAT) RL

  11. Summary • An approach based on risk exposure mastering and metrology resources optimization • Need to extend the approach and take into account • multi failure modes • multi layers of control • different capture rates • measurement depths Thank you for your attention ! Questions ?