Workshop: Development Sustainability & Stormwater Planning/Design

Workshop: Development Sustainability & Stormwater Planning/Design. Stormwater Infrastructure Financing: Getting Decision Makers on Board. Mike Hall, Public Works Director. Stormwater Utility Program Development Feasibility Study Develop program with Stakeholder Groups

Télécharger la présentation

Workshop: Development Sustainability & Stormwater Planning/Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop:Development Sustainability & Stormwater Planning/Design Stormwater Infrastructure Financing: Getting Decision Makers on Board Mike Hall, Public Works Director

  2. Stormwater Utility Program Development • Feasibility Study • Develop program with Stakeholder Groups • Neighborhood Associations • Businesses, Organizations • Churches • Meet with key potential ratepayers • Finalize program goals and financing methods • Develop and pass Stormwater Utility Ordinance

  3. Utility Feasibility Study • Kickoff meeting with Town staff to discuss goals and objectives. • Written summary of financial information (as provided by the Town). • Staff interviews and written interview summaries. • Written summary of existing stormwater program issues, needs and problems.  • Written summary of ERU analysis, with example illustrations of GIS mapping with impervious surface calculations.  • Funding Feasibility Study (DRAFT and FINAL) • Presentation of Study to Town Council.

  4. Project Goals • Advisory Committee Process (SWAC Meetings) • Determine appropriate program costs (5-year budget) • Public feedback • Work with Town Council to establish funding mechanism • Implement funding mechanism • Enact stormwater program objectives

  5. SWAC Process • Storm Water Advisory Committee (SWAC) • Recommended by funding feasibility study • Consisted of over 20 members • Neighbors Association of Normal (NAN) • Churches • Local businesses • Local universities and colleges • Schools • Town of Normal staff • Met 4 times (December 2005 – March 2006)

  6. Discuss Policy Paper Draft Policy Paper Town of Normal Draft Policy Statement Discuss Policy Statement Agree on Policy Statement Advisory Committee (SWAC) Process

  7. SWAC Process:Meeting Topics Existing Program Problems, Needs Goals Program Priorities Planned Program Funding Methods Recommendation

  8. Stormwater Management in Normal • Site Plan Review • Review engineering drawings for new developments • Planning / Design / Construction • Plan / Design regional stormwater management systems • Stormwater Master Plan development • Design and construction of capital improvements • Enforcement • Site inspection (i.e. erosion control enforcement) • Administration • Town Engineering and Public Works staff

  9. Stormwater Management in Normal • NPDES Phase II (Stormwater) Permit • New stormwater regulations (federal mandate) • New required activities (Best Management Practices): • Public education / public involvement • Erosion control • Pollution inspection and prevention • Post-development stormwater management • Changes in operations at municipal facilities • New enforcement requirements • Recordkeeping and annual reporting

  10. Stormwater Problems, Needs, and Goals • Proactive approach to stormwater management • Protect public safety • Reduce flood potential • Careful planning for new land development • Meet new regulatory requirements • NPDES Phase II Permit • Keep up with system maintenance needs • Repair eroded drainage channels • Inlet and catch basin cleaning • Focus on environmental sustainability

  11. SWAC Stormwater Management Program Exercise • Part 1: Identify stormwater issues of importance • Round Robin style • Issues written on Post-Its by meeting facilitators • Part 2: Pick priority issues • Put a mark beside the five stormwater program issues that in your opinion should be the top priorities • Circle the mark for you r top priority

  12. SWAC ProcessStorm Water Program Priorities

  13. SWAC ProcessPolicy Issue Paper #1 – Mission Statement • The mission of the community’s stormwater management program is to enhance public health, safety, and the environment in order to protect lives and property and provide for a better quality of life. (from Policy Issue Paper #1)

  14. SWAC ProcessPolicy Issue Paper #2 – Service Charge • The Town of Normal must have a dedicated source of revenue from which to fund its stormwater management program in order to meet its stormwater management program mission. It has been determined that the primary source of program revenue should be a service charge. (from Policy Issue Paper #2)

  15. SWAC ProcessPolicy Issue Paper #3 – Credit Program • A system of credits will be implemented to provide non-residential customers the means by which to lower their stormwater utility bill in recognition of the customer reducing the burden on the Town’s stormwater management program that the property would otherwise create. (from Policy Issue Paper #3)

  16. SWAC ProcessPolicy Issue Paper #4 – Flat Residential Rate • There will be a single flat rate (as opposed to a tiered rate) charged to owners of single-family residential properties. (from Policy Issue Paper #4)

  17. Why user fees? • Expansion of local government roles • Changing stormwater programs • Other prevailing priorities competing for general fund dollars - police, schools, etc • Shift away from general taxes to fees and demand-based funding - solid waste, waste water • Failure of other funding methods

  18. User fee - based Tax - based Maximum possible program User fee vs. tax funding Planned Program Annual Budget

  19. Storm Water Utility • Stable – reliable level of funding allows planning – not subject to multiple demands • Adequate – program-driven funding levels – planned increases in service levels • Flexible – single method or mix of funding methods – can include special districts • Equitable – property owners pay based on demand they place on the program / system Storm Water Program Funding

  20. Stormwater Program Costs $250 Exceptional $200 Advanced $150 Dollars per Acre per Year Moderate $100 Minimal $50 Incidental $0 How a fee is calculated For every $1 dollar per month per house (and appropriate charges to non-residences), a stormwater utility can typically generate about $25 to $50 per acre per year. $3 charge $1 charge

  21. How a fee is calculated Components: Driveway Rooftop Patio/Sidewalk Impervious Area ERU = Equivalent Residential Unit • Imperviousness is the only physical parameter per parcel • Direct correlation to runoff and thus to demand • Easily measured and verified • Can set minimum threshold for billing (ERU) Residential Parcel

  22. Aerial photography used to map impervious areas • Accurate account of impervious areas for individual properties • Sampling performed in residential areas for ERU determination • 1 ERU = 3,200 sq. ft.

  23. Who Will Pay the User Fee?

  24. Credits Allowed • Credit programs provide rate reductions for property owners in recognition of the impact that on-site runoff control may have on the Town’s stormwater management program. • Credits are given for: • Peak runoff rate reduction • Runoff volume control • Water quality control

  25. How do credits work? • Direct reduction of service charges • Applied after service charges are calculated • Must be applied for; • Criteria set by the Town • Maintenance of stormwater controls required

  26. Questions