html5-img
1 / 28

Undulator Vacuum System/Mechanical

Undulator Vacuum System/Mechanical. By Dean R Walters Advanced Photon Source Argonne National Laboratory. Undulator Vacuum System/Mechanical. Talk Outline Undulator Chamber & Bellows Vacuum System Beamline Diagnostics Schedule Highlights. Undulator Vacuum System.

avel
Télécharger la présentation

Undulator Vacuum System/Mechanical

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Undulator Vacuum System/Mechanical By Dean R Walters Advanced Photon Source Argonne National Laboratory

  2. Undulator Vacuum System/Mechanical • Talk Outline • Undulator Chamber & Bellows • Vacuum System • Beamline Diagnostics • Schedule Highlights

  3. Undulator Vacuum System • Undulator Chamber & Bellows • Chamber Design • Bellows Design • Status of the Prototype

  4. Undulator Vacuum Chamber with Supports Undulator Moves In & Out Vacuum Chamber & Bellows • Design

  5. Chamber Strongback Tubular Chamber 6 mm OD X 5 mm ID Supports Vacuum Chamber & Bellows • Prototype Design

  6. Vacuum Chamber & Bellows Chamber Drawings

  7. Vacuum Chamber & Bellows Bellows Design Drawn by SH Lee

  8. Vacuum Chamber & Bellows Bellows Design (Expanded View) Drawn by SH Lee

  9. Undulator Vacuum Chamber • Status of Prototype • Chamber • Drawings Complete • Outside shops have completed all quotations • All orders have been issued • ANL shop work orders are in place • Fabrication to complete in December 2004 • Bellows • Assembly and parts design complete • Need to draft assembly and part drawings

  10. Undulator Vacuum System • Vacuum System • System Layout • Short Break Section • Long Break Section • Vacuum Pressure within the System

  11. Vacuum System System Layout

  12. Vacuum System

  13. Vacuum System Short Break Section Schematic

  14. Vacuum System Drawn by SH Lee

  15. Vacuum System • Long Break Section Schematic

  16. Vacuum System Drawn by SH Lee

  17. Vacuum System Vacuum Pressure within the System (Thermal Desorption only) Red is at Tube Mid-Point Blue is Average Torr hours

  18. Vacuum System • Vacuum Pressure within the System (includes Thermal Desorption plus Photon Stimulated Desorption) Red is at Tube Mid-Point Blue is Average Torr hours

  19. Undulator Vacuum System/Mechanical • Beamline Diagnostics • RFBPM • Different type under consideration • Highlights of Schedule • Vacuum Testing of Diagnostics Components • What drives this issue • Status of Testing

  20. Beamline Diagnostics C-Band RFBPM now being considered instead of X-Band C-Band has the possibility of using industry supplied electronics According to published literature resolution ~30 nm

  21. Beamline Diagnostics • Highlights of the Schedule • Design work to start March 2005 • Timing of Design work based of funding during Continuing Resolution • Use intervening time to research C-Band RFBPM (ANL) • Goal is to have BPM mechanical design by June 2005 • Goal is to have (3) test BPMs by September 2005 • Currently this schedule is undergoing a review

  22. Beamline Diagnostics • Vacuum Testing of Diagnostics Components • What drives this issue • The Diagnostics Station is considering the use of motion components in the vacuum section where we do not have a lot of experience. • Slides and Stages • Motors • The initial concept was to put the motion components in the vacuum for reasons of positional accuracy. • The design is at a point where changes are possible to move things in and out of vacuum • The intention is to subject components to residual gas analysis and outgassing measurement to qualify them for use.

  23. Beamline Diagnostics

  24. Beamline Diagnostics • Status of Testing • A draft test procedure has been written that covers both residual gas analysis and outgassing measurement. • The Test Set-up is assembled • The Set-up has completed a troubleshoot/ clean-up process • The Set-up is in the process of establishing a base performance profile • Suppliers are being contacted for test samples

  25. Schedule • Diagnostics • Vacuum System

  26. Undulator Vacuum System / Chamber Design • Conclusions: • Prototype Chamber construction progressing • The prototype Bellows has been modeled and after issuing drawings it will enter the fabrication phase. • The order of the Beamline Components is still undergoing some adjustments but it is firming to allow design of the cradle assembly • A new direction for the RFBPM is being considered and work on it is schedule for March 2005 • Motion components vacuum testing has just entered the first stage of testing. • Questions

  27. END

  28. APPENDIX Resulting of Outgassing Calculations

More Related