1 / 14

LHCb gas systems meeting

LHCb gas systems meeting. Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014. Outline. PH-DT-DI Gas Service Team. Gas Service Team mandate:

ayoka
Télécharger la présentation

LHCb gas systems meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014 Outline P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  2. PH-DT-DI Gas Service Team • Gas Service Team mandate: • M&O and upgrades of the gas systems for all the LHC experiments: • preventive and corrective maintenance on 30 gas systems • on-call service all along the year (24/24 7/7) – phone 162516 • Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …) • General support for test beam and equipment belonging to external users. ALICE Albin Wasem Introduction – Working team FSU team Jonathan Dumollard AbdelmajidLaassiri Benjamin P. Marichy HerveMartinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) ATLAS Frederic Merlet (0.25) Louis-P. De Menezes (0.5) Coordination R. Guida CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  3. PH-DT-DI Gas Service Team First contact persons for all issues related to LHCb gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems LHCb Patrick Carrie – Steven Pavis 16-0415 – 16-0929 LHCb experiment and Gas Service Team If Patrick and Steven are on holiday or busy: -during working hours  call directly Roberto (16-2146) -outside working hours  call directly on-call service (16-2516) Outside working hours call directly on-call service (16-2516) P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  4. Gas Service working team • In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: • two new users with high experience in the workshop (mechanics and gas systems) • many students for short and well defined projects • Details: • CERN FTE (and students > 1 year): • 6.3 FTE: +1.3 wrt 2012 • Ernesto: TTS 50% for gas project • “FSU” (FSU + technical users): • 5.5 FTE: +1.5 wrt 2012 • Ace: user on ATLAS budget • Andrei: user on ALICE budget • Trainees (student < 1 year) • 1.9 FTE: +1.8 wrt 2012 • 4 trainees (3 from Poland, 1 from Canada) • 2 summer students • 2 children of staff members Working team P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  5. PH-DT-DI Gas Service Team • 2013 activities can be divided into three main sectors: • Standard maintenance of gas systems for the LHC experiments • LS1 consolidation program for the LHC experiments • Not LHC experiments/support to users • Standard maintenance andLS1 consolidation programconstitute the main field of activity • Not LHC experiments and support to users represent about 20% of the activities LS1 – 2013: Overview P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  6. Review usage of LHCb gas M&O 2013 • LHCb contribution to M&O budget for gas systems: 106 kCHF On-call service: LHCbgas M&O 2013: on-call • Low/high buffer pressure RI1 and RI2 • Atmospheric pressure excursions • Regulation valves manual adjustment • C4F10 recuperation • Power cuts - restart all systems • Backup gases • Purifiers • Analysis systems (common and specific OT) P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  7. Review usage of LHCbgas M&O 2013 On-call service summary On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention triggered by: LHCbgas M&O 2013: on-call • Intervention are: • Equally distributed between experiments • Decreasing with time  P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  8. Review usage of LHCbgas M&O 2013 LHCbgas M&O 2013: material P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  9. Review usage of LHCbgas M&O 2013 LHCbgas M&O 2013: material P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  10. Review usage of LHCbgas M&O 2013 LHCbgas M&O 2013: material for gas workshop P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  11. Review usage of LHCbgas M&O 2013 LHCbgas M&O 2013: FSU resources P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  12. Review usage of LHCbgas M&O 2013 Summary: LHCbgas M&O 2013: summary about 19 kCHF overspending P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  13. 2013 schedule LS1 – 2013 schedule P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

  14. 2014 schedule LS1 – 2014 schedule More details available on the excel table in agenda P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas

More Related