An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS gas systems meeting Outline Introduction Review usage of ATLAS gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014 Outline R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  2. PH-DT-DI Gas Service Team • Gas Service Team mandate: • M&O and upgrades of the gas systems for all the LHC experiments: • preventive and corrective maintenance on 30 gas systems • on-call service all along the year (24/24 7/7) – phone 162516 • Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …) • General support for test beam and equipment belonging to external users. ALICE Albin Wasem Introduction – Working team FSU team Jonathan Dumollard AbdelmajidLaassiri Benjamin P. Marichy HerveMartinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) ATLAS Frederic Merlet (0.25) Louis-P. De Menezes (0.5) Coordination R. Guida CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  3. PH-DT-DI Gas Service Team First contact persons for all issues related to ATLAS gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems ATLAS Louis-P. De Menezes – Frederic Merlet 16-2518 – 16-4089 ATLAS experiment and Gas Service Team If Louis-P. and Frederic are on holiday or busy: -during working hours  call directly Roberto (16-2146) -outside working hours  call directly on-call service (16-2516) Outside working hours call directly on-call service (16-2516) R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  4. Gas Service working team • In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: • two new users with high experience in the workshop (mechanics and gas systems) • many students for short and well defined projects • Details: • CERN FTE (and students > 1 year): • 6.3 FTE: +1.3 wrt 2012 • Ernesto: TTS 50% for gas project • “FSU” (FSU + technical users): • 5.5 FTE: +1.5 wrt 2012 • Ace: user on ATLAS budget • Andrei: user on ALICE budget • Trainees (student < 1 year) • 1.9 FTE: +1.8 wrt 2012 • 4 trainees (3 from Poland, 1 from Canada) • 2 summer students • 2 children of staff members Working team R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  5. PH-DT-DI Gas Service Team • 2013 activities can be divided into three main sectors: • Standard maintenance of gas systems for the LHC experiments • LS1 consolidation program for the LHC experiments • Not LHC experiments/support to users • Standard maintenance andLS1 consolidation programconstitute the main field of activity • Not LHC experiments and support to users represent about 20% of the activities LS1 – 2013: Overview R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  6. Review usage of ATLAS gas M&O 2013 • ATLAS contribution to M&O budget for gas systems: • 189 + 45 (LS1 consolidation) + 13 (MDT Pneumatic valves) kCHF • Total 247 kCHF On-call service: ATLAS gas M&O 2013: on-call • Detector distribution (MDT PT&PCV, RPC, TFC) • ID CO2 flow • Purifiers (TRT, RPC) • Filling - restart systems (RPC, TGC) • Power cuts - restart all systems • Gas supply (CO2, Ar/H2) • Analysis systems (specific selection) • Exhaust module (TRT) • Software (recipe parameters) • Pump (membrane RPC) • PLC failure (MDT) • Profibus failure (CSC) R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  7. Review usage of ATLAS gas M&O 2013 On-call service summary On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention triggered by: ATLAS gas M&O 2013: on-call • Intervention are: • Equally distributed between experiments • Decreasing with time  R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  8. Review usage of ATLAS gas M&O 2013 ATLAS gas M&O 2013: material R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  9. Review usage of ATLAS gas M&O 2013 ATLAS gas M&O 2013: material R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  10. Review usage of ATLAS gas M&O 2013 ATLAS gas M&O 2013: material R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  11. Review usage of ATLAS gas M&O 2013 ATLAS gas M&O 2013: material for gas workshop R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  12. Review usage of ATLAS gas M&O 2013 FSU and users (i.e. Ace) ATLAS gas M&O 2013: FSU resources R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  13. Review usage of ATLAS gas M&O 2013 Summary: ATLAS gas M&O 2013: summary about 26 kCHF overspending R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  14. 2013 schedule LS1 – 2013 schedule R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  15. 2014 schedule More details available on the excel table in agenda LS1 – 2014 schedule R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  16. Software upgrade Main responsible: Steven Pavis • EN-ICE ispreparing the migration to a new software version (CPC6 & more). • The migration requires to (~) completely rewrite the code (PLC+PVSS): • Preparation phase needed to definestrategy and milestons • Define modules, test logic, … • Validation of one/twogassystemscoveringalmost all functionalities • Deployment on one experiment (all detectors) • Deployment on all the experiments • A completecommissioningwillberequired (same as itwasdoneat the first start-up of the gassystems) • About one-twoweek of stop/instability for each detector (CSC, RPC, TRT, TFC, MDT, TGC, ID flushing, …) • ActivitiyscheduledfromJanuary to July 2014 • MDT postponed due to PLC memory issues with CPC6 • TGC postponed due to consolidation work Software upgrade R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

  17. Software upgrade Software upgrade Main responsible: Steven Pavis R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas