1 / 11

LAL Site Report

LAL Site Report. Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr. 100 Go. FC. FC. HDS 9570 4 TB. ESA12000 1,5 TB. Electronic CAD (Sun + Cadence). Alpha Experiments (8 CPUs). Linux Experiments (30 CPUs). GRID Fram (10 CPUs). Mac (100). Xterm. PC (300). Main Resources. DS20.

azize
Télécharger la présentation

LAL Site Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LAL Site Report Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr

  2. 100 Go FC FC HDS 9570 4 TB ESA12000 1,5 TB Electronic CAD (Sun + Cadence) Alpha Experiments (8 CPUs) Linux Experiments (30 CPUs) GRID Fram (10 CPUs) Mac (100) Xterm PC (300) Main Resources DS20 LSF Cluster • NFS • SMB • Appletalk • www • Mail • Print DS20e Gb Ethernet 100 Mb 10 Mb LAL Site Report - HEPix - Edinburgh 2004

  3. Main Resources Changes • More Linux CPUs • 25 dual Opteron 2,2 on order (IBM E325, 1U) • More TBs • HDS 9570V : 2,5 TB added • Running very well • Less budget… • Budget uncertainty (always changing) • No OS upgrade since last meeting LAL Site Report - HEPix - Edinburgh 2004

  4. Mail Service • Virus/Spam filtering production • Spam Assassin + MimeDefang • Tunning in progress to increase efficiency (~70%) • Late with all our main projects for mail service • SIEVE for filtering at message delivery (server based) • Upgrade IMAP server to Cyrus v2 • Required for SIEVE filtering • Authenticated SMTP • Conversion of our current SASL db for transparent user migration with same password db for IMAP and Sendmail LAL Site Report - HEPix - Edinburgh 2004

  5. Windows Infrastructure • IN2P3 forest in production • 9 labs in production (8 sites) • 4 labs should join shortly (by the end of June) • No problem so far… • Forest management not to heavy • Domain management delegated to labs • Move of LAL domain to IN2P3 forest delayed • Planned this summer • Challenge : transparent to users, preserving GPOs • Back to NT4 domain and reupgrade to ActiveDirectory (2003) LAL Site Report - HEPix - Edinburgh 2004

  6. Virus • Not too much affected • Ports attacked filtered in border router • 2 PCs infected by Sasser outside LAL • Checking is time consuming… • Proactive patch installation is critical • Main tool : SMS • Rapid deployment of fixes : 2 hours for 90% of running PCs • Integrating SMS and SUS : SUS feature pack • SUS integrated with SMS inventory and logging capabilites LAL Site Report - HEPix - Edinburgh 2004

  7. Resources Monitoring • Operation Control Center (Tableau de bord) • LAL Solution based on Nagios and RRDTools • HTML front end with a service oriented view • Grouping / aggregation of Nagios status • Alerts and notifications capabilities • Proactive/corrective actions associated with alerts • Performance data with RRDTools (former MRTG) • Services monitored by plugins • Almost everything can be monitored • No platform / OS dependency • Remote execution of plugins through SSH LAL Site Report - HEPix - Edinburgh 2004

  8. Operation Control Center LAL Site Report - HEPix - Edinburgh 2004

  9. Operation Control Center LAL Site Report - HEPix - Edinburgh 2004

  10. GRID • Strong involvement from LAL in EDG / LCG / EGEE • 3 FTE during EDG/LCG (including EDG Integration Team leader) • EGEE : 1 of the official french site, 2 FTE funded • 1 middleware, 1 application deployment • Fabric update : 26 CPUs to be added shortly (total : 36) • Mainly Xeon 3 Ghz and Opteron 2,2 Ghz • Involved in a P2P computing project (XtremWeb) • Partnership with LRI (Orsay, computing research) • 1 FTE (LAL engineer preparing a PHD) • 30 CPUs (mainly Xeon 3 Ghz and Opteron 2,2 Ghz) • LAL interest : use of P2P ressource as a fabric via OGSA LAL Site Report - HEPix - Edinburgh 2004

  11. Miscellaneous Projects • Unattended Linux installation server • Currently based on Kickstart for initial installation • Still planning to investigate EDG WP4 Quattor • Initial installation and updates • Servers and desktops • In conjunction with EGEE involvement (P. Ponianski may join LAL) • Automatic visitor registration and DHCP quarantine • Coupled with a rework of our computers database • Expected one fellow but he resigned after 2 weeks… LAL Site Report - HEPix - Edinburgh 2004

More Related