Status of the beam diagnostics for the SPES project

Status of the beam diagnostics for the SPES project. Conforto Nicola. SPES Control System Group. Marzo 2010. Final goal: - Beam diagnostic system based on grid profiler and faraday cup read-out - Realisation of emittance-meter Work done:

azuka
Télécharger la présentation

Status of the beam diagnostics for the SPES project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the beam diagnostics for the SPES project Conforto Nicola SPES Control System Group Marzo 2010

  2. Final goal: - Beam diagnostic system based on grid profiler and faraday cup read-out - Realisation of emittance-meter Work done: - Setup of an EPICS database to get data from faraday cup and beam profiler, and to set their position too. - Configuration of ADC boards, Digital IO boards, Digital Output boards. - Configuration of Stepper-Motor boards. - Use of CSS interfaces to set and use the diagnostic devices. - Final Setup of the hardware Conforto Nicola SPES Control System Group Marzo 2010

  3. Digital Output Board: -Allows to set output bits -Actual usage: sets the position of the Faraday Cup. Farday Cup interface: - “FC IN” “FC OUT” switch button - Actual value (1nA = 1mV) - 10s, 30s, 60s averages (compress record, updated every 10s) - Plot of the actual value and the 60s average Conforto Nicola SPES Control System Group Marzo 2010

  4. Beam Profile: - “SET BP IN” “SET BP OUT” buttons - Motor status info (BP position) - Actual value, both grids Conforto Nicola SPES Control System Group Marzo 2010

  5. Problems: - Noises when using F.C. with suppressor - B.P. multiplexers are slightly different from each other - B.P. hardware problems on the horizontal grid Next steps: - Set final PV name for the new Pvs - Emittance meter Conforto Nicola SPES Control System Group Marzo 2010