Severity 4 & 5 observations July ’2010 East Region

Severity 4 & 5 observations July ’2010 East Region. Total severity 4 and 5 observation for the month of July.’10:- 35 Nos. After . Before. Severity 4: – Electrical cables were passing from logged rain water. Siemens Fender Kharagpur (East) . Action Taken: Cable stand provided. After .

bairn
Télécharger la présentation

Severity 4 & 5 observations July ’2010 East Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Severity 4 & 5 observations July ’2010 East Region

  2. Total severity 4 and 5 observation for the month of July.’10:- 35 Nos.

  3. After Before Severity 4: – Electrical cables were passing from logged rain water. Siemens Fender Kharagpur (East). Action Taken:Cable stand provided.

  4. After Before Severity 4: Portable Grinder without guard. Siemens Fender Kharagpur (East). Action Taken:Wheel guard provided.

  5. Before After Severity 4: Wooden electrical Panel box with domestic socket found in use at site. Siemens Fender Kharagpur (East). Action Taken:Metalic panel box with industrial socket provided.

  6. Before After Severity 4: Joint in electrical cable was covered by PVC tape only. Siemens Fender Kharagpur (East). Action Taken:Male-Female plug provided for electrical joints.

  7. Severity 4: Worker was fixing lifeline on the erected rafter anchoring his layanyard to the lifeline post. CSP (East) Action Taken: Work stopped. Boom-lift provided for the fixing of lifeline rope in the lifeline post.

  8. Severity 4 & 5 observations July ’2010 West Region

  9. Total severity 4 and 5 observation for the month of June.’10- 69 Nos

  10. Severity 5 – Riggers & Supervisor found w/o Height safety Precaution for Walkway work. (Sun Pharma-Halol) (K.J.IRON) _West (G) Action Taken: Warning given to contractor Site In-charge & supervisor.

  11. Severity 5 – Life line was removed w/o completing secondary work. (Sun Pharma-Halol) (K.J.IRON) _West (G) Action Taken: Warning given to contractor Site In-charge & supervisor.

  12. Severity 5- Nylon Lifting belt was found damage at site. (Jyoti Plastics- Valsad.) (R.K.Builder) _West (G) Action Taken:- Instructed site In-charge Dis-card it immediately .

  13. Severity 5- OneGas Cutting Set was found w/o Flash back arrestor at Cylinder end.(Welspun- S.K. Engg.) _West (G) Action Taken: Stopped activity & Flash Back arrestor provided Immediately.

  14. Before After Severity 5- . Industrial Plug tops not provided. (Welspun – S.K. Engg.) _West (G) Action Taken:- Work Stopped and Immediately Industrial Plug top provided..

  15. Severity 5- Scaffolding was erected w/o ladder, Fall arrestor & Short Platform. (Welspun- S.K. Engg.) _West (G) Action Taken: Work was stopped and asked builder Staff to provide Ladder, Fall arrester & 500mm Platform immediately (in process).

  16. Severity 5-Electrical wire not routed properly & Electrical Box (Industrial Plug top) & ELCB/RCCB (30mA) not provided. (Bafna Nasik -Prathmesh.) _West (M) Action Taken:- Work stopped ;Asked builder Staff to provide ELCB/RCCB/MCB immediately.

  17. Severity 5- Purlin use for Fixing Sag Angle Platform instead of Sag Angle Platform. (Bafna Nasik - Prathmesh.) _West (M) Action Taken: Work Stopped ; Asked builder Staff to provideSag Angle Platformimmediately.

  18. Severity 5- Non std. Safety Belt used for height work.(Bafna Nasik-Prathmesh.) _West (M) Action Taken: Stopped activity & Standard Full Body Harness purchased Immediately.

  19. Severity 5-. Worker working on crane beam without fixing life line. (Wirtgen - Yewat.) _West (M) Action Taken: Work was stopped and asked builder site In-charge to provide life line immediately (Done)

  20. Severity 5- Non-std Single pole Scaffolding Erected. (Krishidhan- Jalana.) (DEVMATA) _West (M) Action Taken:- Instructed them Non Standard Scaffolding Dismantle immediately . (Repetitive violations: Cancelled awarded order for next project)

  21. Severity 5- MCB installed instead of RCCB. (Krishidhan- Jalana.) (DEVMATA) _West (M) Action Taken:- Instructed them to Provide RCCB immediately (Done)

  22. Severity 4 & 5 observations June ’2010 TN Region

  23. Total severity 4 and 5 observation for the month of July.’10- 33 Nos

  24. Before After Severity 5- : Primary member erected without lifeline post (Perlos, Chennai) Action Taken:- Necessary fall protection arrangement provided (Perlos, Chennai)

  25. Severity 4- : No proper lifeline post and no safety harness not harness secured properly at heights (Sheenlac, Chennai) Action Taken:- Work has been stopped (Sheenlac, Chennai)

  26. Severity 4- : No proper access and no harness while working at heights (Sheenlac, Chennai) Action Taken:- Work has been stopped (Sheenlac, Chennai)

  27. Severity 4- : Damaged Slings found used while lifting and shifting and No PPE’s (Perlos, Chennai) Action Taken:- Work stopped (Perlos, Chennai)

  28. Before After Severity 4- : No proper access provided at Mezz sheeting (Perlos, Chennai) Action Taken:- Work has been stopped and rectified (Perlos, Chennai)

  29. Severity 5- :Workers not having harness, Scaffolds erected not having proper wheel lock arrangement (PRP, Madurai) Action Taken:- Stopped the activity (PRP, Madurai)

  30. Severity 5- : Damaged electrical panel board and damaged harness (Cryolor Asia,TN) Action Taken:- Stopped the activity and rectified (Cryolor Asia, TN)

  31. Severity 5- : No proper access, Workers not having safety harness while working at Height (VRV, Tada) Action Taken:- Work has been stopped for necessary compliance (Done)

  32. Severity 4 & 5 observations July ’2010 AP &K Region

  33. Total severity 4 and 5 observation for the month of July.’10- 20 Nos

  34. Severity 4 – Scaffolding being erected on tractor( Carls berg , Hyderabad) Action Taken : Stopped work immediately and instructed to dismantle the structure safely

  35. Severity 4 - Area not proper for crane movement ( Carls berg , Hyderbad) Action Taken : instructed supervisor to coordinate with civil supervisor ad make the area leveled.

  36. Severity 4 –Air compressor without guard ( Carls berg , Hyderabad) Action Taken : Instructed supervisor to provide guard.

  37. Severity 4 –Worker found working on the scaffolding without wearing safety harness( Carls berg , Hyderabad) Action Taken : Instructed supervisor to ensure that all workers are wearing work related PPE.

  38. Severity 4 –Girts and guide ropes not tied as per the procedure( Carls berg , Hyderabad) Action Taken : Instructed supervisor to girts and guide ropes

  39. Severity 4 –Workers found working on the rafter without any fall protection( Carls berg , Hyderabad) Action Taken : Instructed supervisor to provide lifeline on the rafter

  40. Severity 4 & 5 observations June ’2010 North Region

  41. Total severity 4 and 5 observations for the month of July.’10:- 03 Nos.