High-level meeting 2013 " Danube Navigation – a European Perspective ". The current list of projects on bottlenecks on the Danube river. Horst Schindler Budapest, October 9th, 2013 Danube Commission, Budapest.
E N D
High-level meeting 2013 "Danube Navigation – a European Perspective" The current list of projects on bottlenecks on the Danube river Horst Schindler Budapest, October 9th, 2013 Danube Commission, Budapest
Masterplan for achieving recommended fairway parameters Structure Introduction Status Quo Development of Infrastructure Identification of priority areas Masterplan Basis Belgrade Convention TEN-T priority areas Waterway Classification Reports of Memberstates Masterplan Structure follows Classification Bridges and fairway distinguished Fields of action General descriptions of projects Adopted through Decision DK/TAG 77/13 from the 25th December 2011 Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters Wachau Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters Bratislava/Wolfsthal Gabcikovo/Nagymaros Port Devinska Nova Ves Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters Apatin Study Szob-Mohács Vermelj/Petres 7 critical sections Staklar Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters 7 critical sections Belene ISPA 2 Batin Sulina Canal ISPA 1 Danube Navigation – a European Perspective Budapest, October 9th, 2013
Thank you for your attention • Horst Schindler • Chief Engineer • Danube Commission • Benczúr utca 25 • 1068 Budapest • horst.schindler@danubecom-intern.org Danube Navigation – a European Perspective Budapest, October 9th, 2013