This document outlines the action items from the 16:00 meeting regarding the transport and testing of the EM2 TEM/PSU unit. Key tasks include inspections of mechanical components, proof testing of lift fixtures, and fabrication operations for the Van de Graaff. Operator workstations setup and training sessions are scheduled, along with the provision for cosmic ray data checks. Additionally, a schedule for the delivery of EM2 EGSE to IFCT is to be determined, and various testing procedures and calibrations will be executed as detailed in the meeting notes.
E N D
Action Items • Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz • Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton • Proof test of Mini-Tower assembly lift fixture – Dave Kiehl • Manufacture Van de Graaff part – Reggie Rogers • Repair Van de Graaff – Gary Godfrey • Prepare for Van de Graaff operations – Gary Godfrey, Mech. Team • Build Mini-Tower assembly cart/cage – Mech. Team • Setup operator workstations in room 102 – John Canfield • Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline • Check Cosmic Ray test data – Xin Chen • Module time-in procedure – Brian Horwitz, Larry Wai • Determine schedule for delivery of EM2 EGSE to IFCT – Brian Horwitz • Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz • EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz • Swap-in EM2 TEM/PSU – Eliazar Ortiz • Setup for Single Bay LPT – Eliazar Ortiz • Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller • CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz • Execute CAL CPT – Brian Horwitz, John Canfield • Execute TKR CPT – Brian Horwitz, John Canfield