1 / 15

Waterperry Village Plan Steering Group

Results of a preliminary survey of village opinion: November 2012. Waterperry Village Plan Steering Group . Aims for today to present results of our initial survey t o identify areas for further research and action t o enlist village involvement in these action areas

baylee
Télécharger la présentation

Waterperry Village Plan Steering Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results of a preliminary survey of village opinion: November 2012 WaterperryVillagePlan Steering Group

  2. Aims for today • to present results of our initial survey • to identify areas for further research and action • to enlist village involvement in these action areas • to outline the next steps Waterperry VillagePlan Steering Group

  3. The survey: • A preliminary survey only • Raises topics to explore further • Not a controlled, scientific survey • Numbers only rough guide to level of interest • Detailed consultation will be carried out later Waterperry VillagePlan Steering Group

  4. Returns: • 109 blank questionnaires were circulated • 52 completed questionnaires were returned and analysed • Some households chose to return only one form, so response rate is higher than might first appear. Waterperry VillagePlan Steering Group

  5. What we canvassed opinions about: • Best things and worst things about Waterperry • Village road and transport • Landscape and environment • Development and planning • Communication and administration • Social/events • Facilities and amenities Waterperry VillagePlan Steering Group

  6. What we found out: Waterperry VillagePlan Steering Group

  7. Peaceful 15 Rural location in green belt 11 Unspoilt 7 Friendly people/good community spirit 11 No-one bothers you 3 Waterperry Gardens 9 Art in Action 8 Generosity of W/P House 3 Wildlife 2 Kit Arnold 2 Best Worst Traffic: speed/volume/type 11 Lack of buses 9 State of road and verges 8 Lack of pub/meeting place 8 Lack of community spirit 3 Lack of shop 2 M40 noise 6 Brookes parking 1 Footpaths poor 1 Poor communication 1 Commercialisation of W/P Gardens 1 Broadband slow 1 What is the best and worst thing about living in Waterperry?

  8. Lack of bus service 27 Road in poor condition 21 Road to WaterperryCommon poor 4 Road fine 4 Flooding of roads/improve drainage 3 S-bend on main road: improve safety 2 Brookes parking 4 Traffic - volume/type/speed 16 Speed limit of 20mph 5 Verges - damage 20 Pavements pro 3/anti 4 Kerbs pro 3/ anti 3 No speed humps 3 Grit road in winter 1 Village road and transport

  9. Verges/pear trees need tending 11 Protect wide verge 2 Wildlife to be encouraged 7 Trees/hedges/verges – protect 5 Footpaths and bridleway – improve 10 Extend footpath network 4 Lack of access to river 3 Improve footpath signage 2 Dog fouling 3 Happy with landscape 2 Ditches – maintain 2 Noise from M40/biomass 2 Litter and building waste 1 Restrict bonfires 1 Mowing rota for rec and churchyard 1 Landscape and environment

  10. Maintain unspoilt character of village 15 No new building/extensions only 5 Limited, sensitive new building only 12 Some housing OK 8 Conservation area pro 15/ anti 5 Happy with planning process 5 Oppose industrialisation 7 Commercialisation of W/P Gardens 2 Retrospective planning – reduce 1 House prices too high 1 Developmentand planning

  11. Broadband speed slow 16 Parish magazine liked 12 More notice of events 4 Website: use more/update 7 Use email more 3 PC minutes circulate/on website 3 Phone box liked – use more 3 Communications fine 2 Newsletter 2 Visit elderly 1 Communicationand administration

  12. More events/clubs 20 Suggestions: summer picnic/BBQ, more quiz nights, fete, activities for children, art club, history club, gardening club, yoga Happy with level of events 10 More help/support needed 9 Use of rec for more events 4 Lack of community spirit 3 Social/events

  13. Lack of pub 15 Lack of shop 15 Lack of village hall 7 Garden centre/teashop liked 10 Church: support/make more use of 8 Play equipment needed 16 Rec not just for children 2 Playground not a priority 1 Facilities fine 3 Central meeting place needed 1 Facilities and amenities

  14. Set up Working Groups to explore main issues in each area: • Village road and transport (Adrian) • Landscape and environment (Jonathan) • Development and planning (Tricia) • Communication and services (Kendall) • Social/events (Kit) • Facilities and amenities (Sue) The next step:

  15. To research main issues raised by initial survey • To gather information • To liaise with relevant organisations • To explore feasibility/cost of different options • To report back to Steering Group • Village will be consulted in detail on options researched by Working Groups The role of Working Groups

More Related