1 / 51

Emirates prefabricated & steel building (L.L.C)

INTRODUCTION. Emirates prefabricated & steel building (L.L.C). INDUSTRIAL PROJECTS. MILITARY PROJECTS. RESIDENTIAL PROJECTS. AWARDS. CONTACT US. Introduction.

becca
Télécharger la présentation

Emirates prefabricated & steel building (L.L.C)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTRODUCTION Emirates prefabricated & steel building (L.L.C) • INDUSTRIAL PROJECTS • MILITARY PROJECTS • RESIDENTIAL PROJECTS • AWARDS • CONTACT US

  2. Introduction • Though started small in size, however it is vast in aspiration, willingness and resolution for excellence and its desire to take honor and pride in participation into this overall construction drive of the United Arab Emirates. • When we started in 2003, we were aware of the fact that the emergence of a new contracting company into this market congested with companies operating in this field since ages is an adventure that was never taken simple with a mission not so easy.

  3. Vision : • To be the clients' first choice in turnkey solutions for specialized and integrated construction requirements across the GCC and Asia. Mission : • EPS is dedicated to the delivery of world-class turnkey solutions to our stakeholders in partnership with our clients, consultants and the government. We achieve this through adhering to the highest standards of safety, quality and environmentally centric practices while completing our projects on time and within budget

  4. Company Structure Emirati Sponsor

  5. Company owners • EPS Factory is an industrial Limited Liability Company associated with Sands Consultant Engineers owned by Tow owners Owners: • 1 – Eng. Mudhafar A. Wadi • 2 – Eng. Muheeb A. Rishan.

  6. Message from President , Executive Chairman & Managing director • Our success can be attributed to our commitment to maintain a harmonious and professional working environment based on honesty, fair dealing and sound business ethics. Our organization is strongly committed to implementing policies and procedures that reflect a high level of ethical business practices and client satisfaction. We are committed to building excellence through partnerships and we will continuously strengthen our policies and practices to promote the interests of our clients, partners, employees' community and the country in which we operate.

  7. Skills & Concepts • We in all of our projects, we have used modern methods in construction that have been used in U.S.A in several styles and different specifications.

  8. INDUSTRIAL Projects • INDUSTRIAL PROJECTS

  9. INDUSTRIAL Projects • Al Dar Site AlRaha Beach, Abu Dhabi 1250 Caravans for 5000 Workers • Client : ALDAR • Contractor : ISCS Contracting • Cost : 6.543.000 Dhs. • Location : U.A.E - Abu Dhabi • year of completion : 2007

  10. INDUSTRIAL Projects • Parsens Camp • Client : Parsens Company • Contractor : EMEC Contracting • Cost : 23.855.000 Dhs. • Location : Iraq – Baigi • year of completion : 2006

  11. INDUSTRIAL Projects • Al Rumaila Oil Field • Client : China Petroleum Engineering • Contractor : Al Rumaila Gate • Cost : 10.323.000 Dhs. • Location : Iraq – Basra • year of completion : 2011

  12. INDUSTRIAL Projects • BP Petroleum Project • Client : British Petroleum • Contractor : ALAMCO Contracting • Cost : 17.600.000 Dhs. • Location : Iraq – Basrah • year of completion : 2011

  13. INDUSTRIAL Projects • Construction Of Incinerator • Client : Inglett And Stubbs Int. • Location :Balad / Iraq • year of completion :Mar.2006 – Nov.2006 • Project Description: Installation of 4 each incinerator units with mechanical and electrical infrastructure including power supply and a warehouse.

  14. INDUSTRIAL Projects • Moonlight Warehouses • Client : Moonlight Company • Cost : 4.650.000 Dhs. • Location : U.A.E – Ajman • year of completion : 2008

  15. INDUSTRIAL Projects • Bin Ham Warehouses • Client : Bin Ham Company • Contractor : Over Seas Company • Cost : 3.670.000 Dhs. • Location : U.A.E - Abu Dhabi • year of completion : 2009

  16. INDUSTRIAL Projects • Bin Hafez Warehouses & Camps • Client : Bin Hafez Company • Contractor : Over Seas Company • Cost : 7.200.000 Dhs. • Location : U.A.E – Dubai • year of completion : 2006

  17. MILITARY Projects • MILITARY PROJECTS

  18. MILITARY Projects • Directorate of Military Works Projects • Clint : Directorate of Military Works • Contractor : RECH Contracting • Cost : 2.375.000 Dhs. • Location : U.A.E – Abu Dhabi • year of completion : 2011

  19. Military Projects • Police Academy Project • Clint : Ministry of the Interior • Contractor : ALAMCO Contracting • Cost : 34.130.000 Dhs. • Location : Iraq – Baghdad • year of completion : 2004

  20. Military Projects • U.S Army Camps • Client : U.S Army • Cost : 64.225.000 Dhs. • Location : Iraq – Salah Al Deen • year of completion : 2010

  21. Military Projects • U.S Army Camps

  22. Military Projects • Design And Construct Fyos Dining Facility • Client : Kellogg Brown & Root • Location : Camp Delta / Iraq • year of completion :Oct. 2009 – Dec. 2009 • Project Description: The Project consists of design and construction of a Dining Facility at Forwarding Operating Base (FOB) Delta to support military operations. Anti-terrorism measures are included. The Facility is approximately 60.000SF. The Dining facility has the ability to serve 5900 personnel per meal. All furnishings and kitchen equipments are provided and installed. The Facility also includes all supporting facility requirements such as power production and distribution requirements, water and sewage distribution systems, mechanical systems and other supporting facility features such as roads, curbs, walkways, parking pavement, walkways and site drainage. The building has an integral protective roof system that includes, a two layer protective roof system consisting of pre-detonation layer 100MM insulated steel panels supported on steel framing. The fragmentation roof is a 150MM composite steel/concrete roof deck with the steel decking of 16 gage minimum.

  23. Military Projects • Design And Construct Convoy Support Center, Phase I And Phase II • Client : Kellogg Brown & Root • Location : Tallil Air Base / Iraq • year of completion :Nov. 2009 • Project Description: Project Consists of the design and construction of the Convoy Support Center which is 1.5 km square with pre-engineered metal or modular facilities. The work includes the preparation of design documents and construction of a fully functional facility providing, all labor, materials and equipments. This Project also consists of completion of the design and construction of a 12MW (megawatt) diesel-fired Power Plant and connection to associated utilities. This includes preparation of all design documents for mechanical systems at the Power Plant. Preparation of design documents for and construction of the site 11 KV (Kilovolt) primary power distribution system around the Convoy Support Center (CSC) and 400/230 V secondary electric power services to facilities as required. Preparation of design documents for and construction of two new Reverse Osmosis Water Purification Units (ROWPUs) along with all associated tanks, pumps, power supply, piping and chemical storage at the existing water supply point at COB Adder. • Preparation of design documents for and construction of a wastewater collection system including piping and holding tanks at the CSC site. • Preparation of design documents for, and paving of existing roadways.

  24. Military Projects • Joint Distribution Center/Central Distribution Center ( Jdc/Cdc ) Yard • Client : Inglett And Stubbs Int. • Location : Balad / Iraq • year of completion :Jan. 2007 – Jan. 2008 • Project Description: The Project has consisted of design and build of three facilities totaling 32640 SM and configured for dry storage functions, warehouse functions at Camp Anaconda Balad/ Iraq; Class 1 facility configured for dry storage functions at 14400 SM. Multiclass facility has configured for warehouse functions at 9120 SM. Also FRP facility has configured for maintenance functions at 9120 SM. The supporting facilities have included a pump house for sprinkler system, generator sunshades, site grading, storm drainage, utility connections to suit the various mission requirements at Camp Anaconda Bald in Iraq. Thermal insulation of facilities has been provided by polyurethane foamed galvanized metal size and roofing panels. Regular type, wet type and fire rated gypsum partition boards have been used in facilities to separate the interior spaces. Doors have been selected in accordance with Anti-Terrorism Force Protection standards. Buildings have been supported with sprinkler system, fire detection systems.

  25. Military Projects • Power Plant • Client : Kellogg Brown & Root • Location :Camp Speicher / Tikrit / Iraq • year of completion :2004 - 2005 • Project Description: 11kv 18 MVA Power plant and 11 kv Power Grid system and 17 EA 11/0.4 kv Secondary Substations at Tikrit, Iraq. This system has included Bea 11kv, 2275 MVA Diesel generators, 3ea 11kv Busbar system, Master synchronization panel-technical description of control and monitoring of generators and load bus control panel. 11/0.4 kv Mobile Type Secondary Substations have included 630 A RMU, 630 and 1000 Kva Transformers and LV panels. Also outdoor x indoor electrical systems and automatic control system for buildings, warehouses, oil pump stations have provided and installed by EPS Co. • This Project design, installation, test and commissioning of MV Power Plant, 11 kv Grid System and 141/0.4 kv Secondary Substations has been done per the international Codes.

  26. Military Projects • Combat Aviation Brigade Beddown Airfield Pavement • Client : KBR / US Corps Of Engineers • Location :Tallil Air Base / Iraq • year of completion :Oct. 2008 – Nov. 2009 • Project Description: The Project consists of designing and construction of Armed Helo Apron, Un-Armed Helo Apron, ISR Airlift Ramp and an Air Traffic Control Tower at Tallil Air Base, (Approximately 280.000 sqm concrete pavement area). The airfield pavements have edge lighting and flood lighting. The airfield pavement design and construction scope includes but not limited to all required site work, paving or surfacing, supporting utilities/infrastructure, signage, paint / markings, lighting and security necessary to make them complete and usable. The Air Traffic Control Tower design and construction scope includes but not limited to the Air Traffic Control Reinforced Concrete Tower, site work, utilities / infrastructure, fire protection / suppression, fire pumphouse, communications infrastructure, Access roads/ routes / parking, and force protection / security to make it complete and usable facility. • Materials was Purchased from Turkey and USA as well as locally.

  27. Military Projects • KBR Man Cap, 800 Living Container • Client : Kellogg Brown & Roof • Location :Lsa, Anaconda / Iraq • year of completion :July. 2005 – July. 2006 • Project Description: The Project consist of Design and Construction of the site associated with utilities to support 800 trailers (3x10 m), trailer fabrication, transportation, foundations, placemet, HVAC system and utility connections of 1.600 person capacity billeting trailers to suit the various mission requirements at LSA Anaconda / Balad in IRAQ. The work in this contract includes the preparation of Design documents and the construction required to provide fully functional facilities with force protection measures.

  28. Military Projects • Life Support Operations And Maintenace • Client : Kellogg Brown & Roof • Location :Lsa, Anaconda / Iraq • year of completion :2004 – 2007 • Project Description: Work consist of construction of establishing a Labor Camp for 2.500 personals and serving to 25.000 people in the areas of Construction, Infrastructure, Catering, Laundry Service, Grounds Keeping, Cleaning, Custodial and janitorial Services and electromechanical maintenance and vehicle maintenance. Man camp includes; Dormitories, Dining Facility, Morale, welfare and recreation centers, Canteen, Shopping Center, Laundry, Showers & Latrine areas, GYM, Power Plant, Waste water system, Portable water system, Call Shop, Medical Clinic, HVAC System, Security, Utilities and IT System.

  29. Military Projects • 53 Each Building Renovation Projects • Client : Kellogg Brown & Roof • Location :Balad / Iraq • year of completion :Sep. 2004 – Nov. 2006 • Project Description: Scope of work includes the renovation of 53 each buildings with total built up area of around 40,000 square meters. Electrical, Mechanical and architectural renovation of these buildings have been done in the required US. Building codes and standards. All electrical and mechanical infrastructure renovation have also been done by EPS Co.

  30. Military Projects • Construction Of Fitness And Community Center • Client : Kellogg Brown & Roof • Location :Balad / Iraq • year of completion :Mar. 2004 – Apr. 2005 • Project Description: Two each steel structure buildings with total built up area of 20,000 square meters. Scope of work includes civil works, structural works. Provision and installation of force protection measures such as concrete barriers and provision and installation of all furniture’s and equipments have also been done by EPS Co.

  31. Military Projects • Construction Of Ssa Warehouses • Client : Kellogg Brown & Roof • Location :Balad / Iraq • year of completion :June. 2004 – May. 2005 • Project Description: 3 each steel structure buildings with total built up area of 30,000 square meters. Scope of work includes civil works, provision and installation of prefabricated steel structure and wall claddings, electrical works, HVAC, Provision and installation of all electrical and mechanical infrastructure including power generators. Force protection measures such as concrete barriers which surround the buildings have also been provided and installed by EPS Co.

  32. Military Projects • Construction US Army Headquarters • Client : US Army • Location :Balad / Iraq • year of completion :June. 2004 – Feb. 2005 • Project Description: Construction of US Army Headquarters Building. Scope of work includes all disciplines of construction, including provision and installation of generator sets, landscaping and force protection measures such as shielded slab and walls.

  33. residenTIAL Projects • RESIDENTIAL PROJECTS

  34. residenTIAL Projects • Birecik Dam & Hepp Turn-key Operators Village Cons (Subcontract) • Client : Holzmann-gama-strabay JV • Location :Birecik / Turkey • year of completion :2003 – 2004 • Project Description: The work consisted of constructing an integral site for the operators of the hydroelectric dam on the Firat River. Everything started from scratch to the completion of a small town. The basic designs were done by joint venture designers. But the actual distribution of the housing and other common buildings were done by our design proposals and the design office collaboration. A- The work included bachelor housings, flats, family housings (single and double), restaurants, club-house, school, gymnasium, church, gas station, entrance building, social building, administration building, tennis courts, swimming pool, toddler’s pool, saunas, and shopping mall. B- The work included the site arrangement, landscaping, roads, walkways, street lighting, TV distribution system, telephone distribution system, high medium and low voltage electrical distribution, drainage systems, drainage channels, raw water collection for the dam, raw water distribution, waste water collection, fire water distribution, raw water header tank, portable water header tank and distribution, fire hydrants, retaining walls, pergolas, waste water treatment and pumping station, water. Treatment plant and pumping station, sub-transformers, chiller rooms.

  35. residenTIAL Projects • Complex of Villas ( low cost ) • Client : Private Office of His Highness Sheikh Saif bin Zayed Al Nahyan • Cost : 3.100.000 Dhs. • Location : U.A.E – Al Ain • year of completion : Under construction

  36. Other Projects • Sheikh Khalifa Bin Zayed Al Nahyan Masjed Site office • Client : Department of Presidential Affairs • Contractor : Unisons Company • Cost : 5.800.000 Dhs. • Location : AL Ain - U.A.E • Area : 2600 Sq/m • year of completion : 2011

  37. Other Projects • Sheikh Khalifa Bin Zayed Al Nahyan Masjed Site office

  38. Other Projects • ISMAIL HAKKI TONGEC SWIMMING POOL • Client : Carrefour Sa. • Location :Ankara / Turkey • year of completion :Dec 2004 • Project Description: Design and build of a semi Olympic indoor pool with all auxiliary and administrative buildings.

  39. Other Projects • Car Shed

  40. Awards • AWARDS

  41. Awards

  42. Awards

  43. Awards

  44. Awards

  45. Awards

  46. Awards

  47. Awards

  48. Car Shed

  49. Car Shed

  50. CONTACT US • U.A.E – Abu Dhabi Office Hamdan Bin Mohamed St. Mob : +971 552219581 E-mail : muheeb.ahmed@yahoo.com • U.A.E – Ajman Office Sheikh Khalifa St. Emirates Islamic Bank Building Fl.№:1005 Tele : +971 6 7466033 Fax : +971 6 7466013 Mob : +971 509571123 P.O. Box : 13390 Ajman E-mail : emi.modafer@yahoo.com • Factory: Ajman new industrial plant Mob : +971 504536974 E-mail : • emirates_cabin@yahoo.com • Iraq Office Basrah Mob : +964 7804802099 E-mail : • emirates_cabin@yahoo.com • CONTACT US

More Related