1 / 35

LAKE CHAMPLAIN BRIDGE PUBLIC INFORMATION MEETING AUGUST 29, 2006 7:00 – 9:00 P.M.

LAKE CHAMPLAIN BRIDGE PUBLIC INFORMATION MEETING AUGUST 29, 2006 7:00 – 9:00 P.M. BIN 5521180 PIN 1805.81 NYS DEPT. OF TRANSPORTATION, REGION ONE VERMONT AGENCY OF TRANSPORTATION. BRIDGE BACKGROUND. AGE: Built in 1929. Currently 77 years old.

Télécharger la présentation

LAKE CHAMPLAIN BRIDGE PUBLIC INFORMATION MEETING AUGUST 29, 2006 7:00 – 9:00 P.M.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LAKE CHAMPLAIN BRIDGEPUBLIC INFORMATION MEETINGAUGUST 29, 20067:00 – 9:00 P.M. BIN 5521180 PIN 1805.81 NYS DEPT. OF TRANSPORTATION, REGION ONE VERMONT AGENCY OF TRANSPORTATION

  2. BRIDGE BACKGROUND AGE: Built in 1929. Currently 77 years old. SPANS: 14 spans with a total length of 2184 ROADWAY WIDTH: 26.1’ STRUCTURAL TYPE OF BRIDGE: Combination of thru truss, deck truss, and deck plate girders. VERTICAL CLEARANCE ON BRIDGE: 14’0” VEHICLE CLERANCE UNDER BRIDGE (MAX): 95’0” AADT: Approximately 3400 vehicles (2005) LOAD POSTED: R – Restricted (1994) LAST MAJOR WORK COMPLETED IN 1991: Just 15 years ago.

  3. CURRENT CONDITION OF BRIDGE & THUS THE NEED FOR A PROJECT • Condition Rating of Bridge: 3.764 (based on scale of 1 to 7) • Federal Sufficiency Rating of Bridge: 29.2 (based on a scale 1 to 100) • Piers: Advanced State of Deterioration. • Primary Members: Main Carrying Members • Bridge Bearings • Bridge Joints • Wearing Surface

  4. PRELIMINARY ALTERNATIVES PERCEIVED AS REASONABLE • Rehabilitation • Replacement on Existing Alignment • Replacement on Slightly Modified Alignment • Replacement on Totally New Alignment (essentially new location)

  5. DISCUSSION OF REHABILITATION ALTERNATIVE(Minimum Work Required) • Paint Bridge • Replace Bearings (Jack up bridge, pour new pedestals, modify bearing connections, install new bearings) • New Bridge Deck Joints • New Wearing Surface • New Bridge Rail • Steel Repairs of Corroded Areas (primary & secondary members) • Rivet Removal & Replacement • Connection Repairs • Structure Repairs/Replacement • New Navigational Lighting • New Bridge Lighting • Deck Replacement on Span 7 Only • Repairs to Steel Beams (Piers on land) • Seismic Retrofits Where Possible

  6. DISCUSSION OF REPLACEMENT ALTERNATIVES • All New Bridge Structure Components • Seismic Design to Current Standards • Weathering Steel (no painting required) • Type of Structure – Probably Multi-girder Design • Architectural Enhancements

  7. EXPECTED ISSUES/DISCUSSSION POINTS • Age • Historical Nature of Bridge • Historical Nature of Area • Pedestrian & Bicyclists Accommodation (Roadway & Bridge Width) • Permits • Seismic Retrofits Or Design • Navigation Clearance (Horizontal) • Vertical Clearance on Bridge • Vertical Clearance Under the Bridge • Non-redundancy of Structure • Load Posting • Overall Bridge Length & Spans • Grades on Bridge • Sight Distance • Initial Project Cost • Life Cycle Costs

  8. NEXT STEPS • Aerial Survey • Mapping • Cores from Piers • Design Team Formulated • Full Bridge In-depth Inspection & Updated Load Rating • Establishment of a Lake Champlain Advisory Committee

  9. COMMENTS Send to: Timothy R. Conway, P.E. NYS Department of Transportation 328 State Street Schenectady, NY 12305 OR Email:tconway@dot.state.ny.us